310 CMR 15.203
System Sewage Flow Design Criteria
(1) Each component of an on-site subsurface sewage disposal system shall be designed to treat
sanitary sewage discharged from all buildings to be served by the system using the System
Sewage Flow Design flows set forth at 310 CMR 15.203(2) through (5), except as provided in
310 CMR 15.203(6). Actual water meter data shall not be substituted for the design flow criteria
for the activities listed in 310 CMR 15.203(2) through (5) unless pursuant to 310 CMR 15.416.
Design flow is equivalent to estimated generated flow for the proposed use plus a factor
representing flow variations.
MINIMUM
ALLOWABLE
GPD FOR
GALLONS
SYSTEM
TYPE OF ESTABLISHMENT
UNIT
PER DAY
DESIGN
(2) RESIDENTIAL
Bed & Breakfast
per bedroom
Bed & Breakfast
per bedroom
with restaurant open
per seat
to public add
Camp, resident, mess hall,
per person*
washroom and toilets
Camp, day, washroom
per person
and toilets
Camp, day, mess hall,
per person
washroom and toilets
Campground, showers and toilets
per site
Family Dwelling, Single
per bedroom
330**
including, but not limited to, single family condominiums & cooperatives
Family Dwelling, Multiple
per bedroom
***
Family Mobile Home Park
per mobile home
Motel, Hotel, Boarding
per bedroom
House
Retirement Mobile
Home Park
per site
Housing for the Elderly
per two bedroom
unit
150****
Work or Construction Camp
per person
*
Person in the context of 310 CMR 15.203 means an individual.
**
A system may be designed for flows of not less than 220 gpd, if a deed restriction essentially identical
to the model Grant of Title 5 Bedroom Count Deed Restriction developed by the Department, is
provided that limits the dwelling to two bed rooms as the term "bedroom" is defined in 310 CMR
15.002. A home office or home retail business whose only employees reside in the home, where no
additional wastewater is generated other than toilet and hand washing waste, is not considered a
change in the type of establishment and does not require the addition of flow for the purpose of
designing the system.
***
The number of bedrooms in a condominium shall be as specified in the Master Deed. Establish-
ment of bedrooms in excess of the specified number shall be considered an increase in design flow.
A home office or home retail business whose only employees reside in the home, where no additional
wastewater is generated other than toilet and hand washing waste, is not considered a change in the
type of establishment and does not require the addition of flow for the purpose of designing the
system.
****
One bedroom unit Housing for the Elderly, and units with more than two bedrooms shall be designed
based on 110 gallons per day per bedroom.
(3) COMMERCIAL
Airport
per passenger
Barber Shop/Beauty Salon
per chair
Bowling Alley
per alley
Country Club, dining room
per seat
Country Club, snack bar or
lunch room
per seat
Country Club, lockers and
showers
per locker
Doctor Office
per doctor
Dentist Office
per dentist
MINIMUM
ALLOWABLE
GPD FOR
GALLONS
SYSTEM
TYPE OF ESTABLISHMENT
UNIT
PER DAY
DESIGN
(3) COMMERCIAL (continued)
Factory, Industrial Plant,
per person
Warehouse or Dry Storage
Space without cafeteria
Factory, Industrial Plant,
Warehouse or Dry Storage
Space with cafeteria
per person
Gasoline Station
per island*****
with service bays
per bay
*****
Plus flows for bays, if any
Kennel/Veterinary Office
per kennel
Lounge, Tavern
per seat
Marina
per slip
Movie Theater
per seat
Non-single family/
per washing
automatic clothes washer
machine
Office building
per 1000 sq.ft.
Retail Store (except supermarkets)
per 1000 sq.ft.
Restaurant
per seat
Restaurant, thruway
per seat
service area
Restaurant, Fast Food
per seat
Restaurant, kitchen flow
per seat
[for sizing of grease
trap only]
Service Station
per bay
[no gas]
Skating Rink
per seat
Supermarkets
per 1000 sq.ft.
Swimming Pool
per person
Tennis Club
per court
Theater, Auditorium
per seat
Trailer, dump station
per trailer
(4) INSTITUTIONAL
Place of worship without kitchen
per seat
with kitchen
per seat
Correctional Facility
per bed
Function Hall
per seat
Gymnasium
per participant
Gymnasium
per spectator
Hospital
per bed
Nursing Home/Rest Home
per bed
Assisted Living Facilities
per bed
Public Park, toilet
per person
waste only
MINIMUM
ALLOWABLE
GPD FOR
GALLONS
SYSTEM
TYPE OF ESTABLISHMENT
UNIT
PER DAY
DESIGN
(4) INSTITUTIONAL (continued)
Public Park, bathhouse,
per person
showers and flush toilets
Day Care Facility
per person
(5) SCHOOLS******
Elementary School,
without cafeteria,
gymnasium or showers
per person
Elementary School,
with cafeteria but
no gymnasium with showers
per person
Elementary School,
with cafeteria,
gymnasium and showers
per person
Secondary/Middle School,
without cafeteria,
gymnasium or showers
per person
Secondary/Middle School,
with cafeteria but
no gymnasium or
showers
per person
Secondary/Middle School,
with cafeteria, gymnasium
and showers
per person
Boarding Schools,
Colleges
per person
****** All schools to be served by an alternative technology approved pursuant to 310 CMR 15.280 through
15.288 shall have an equalization basin as part of the system design and have it installed prior to the
treatment device.
(6) Facilities other than those listed in 310 CMR 15.203(2) through (5), and nonresidential
facilities with unique design features that result in significantly different design flows than those
listed above may apply to the Department for a determination of design flow using actual meter
readings of established flows from existing or similar installations without the need for a
variance pursuant to 310 CMR 15.410 or 15.416. Prior to making a determination the
Department will consult with the local Approving Authority. For state and federal facilities,
the Department may also establish system design flows other than those listed above using actual
meter readings of established flows from existing or similar installations. Any design flow
established by the Department pursuant to 310 CMR 15.203(6), shall be based on 200% of
average water meter readings in order to assimilate maximum daily flows or on other methods
determined to be appropriate by the Department.
(7) In schools, flows generated from sinks or other drains receiving wastes from science
laboratories, graphics arts classrooms, or vocational school activities, including, but not limited
to, automotive repair painting, or metal fabrication are classified industrial wastes and shall be
directed pursuant to an appropriate permit, to a sewer, if a sewer connection is feasible and, if
not, then to an industrial waste holding tank in accordance with 314 CMR 18.000: Industrial
Wastewater Holding Tank and Container Construction, Operation, and Record Keeping
Requirements or an approved hazardous waste collection receptacle.