310 CMR 15.211
Minimum Setback Distances
(1) All systems must conform to the minimum setback distance for septic tanks, holding tanks,
pump chambers, treatment units and soil absorption systems, including reserve area, measured
in feet and as set forth below. Where more than one setback applies, all setback requirements
shall be satisfied.
Septic Tank
Soil Absorption System
Holding Tank
Pump Chamber
Treatment Unit
Grease Traps
Property Line
10[5]
10[5]
Cellar or Crawl Space Wall,
Swimming Pool (inground), foundation drain
Slab Foundation
Water Supply Line (pressure)
10[1]
10[1]
Surface Waters (except wetlands)
Bordering Vegetated Wetland (BVW),
Salt Marshes, Inland and Coastal Banks
Surface Water Supply -
Reservoirs and Impoundments
Tributaries to Surface
Water Supplies
Wetlands bordering Surface Water Supply
or Tributary thereto
Certified Vernal Pools
100[2]
Private Water Supply Well or Suction Line
Public Water Supply Well
(2)
(2)
Irrigation Well
Open, Surface or Subsurface Drains which
discharge to Surface Water Supplies or
tributaries thereto
Other Open, Surface or Subsurface Drains
(excluding foundation drains) which
intercept seasonal high groundwater
table [3]
Other Open, Surface or Subsurface Drains
(excluding foundation drains)
Leaching Catch Basins &
Dry Wells
Downhill Slope
not applicable
15[4]
[1] Disposal facilities shall be at least 18 inches below water supply lines. Wherever sewer
lines must cross water supply lines, both pipes shall be constructed of class 150 pressure pipe
and shall be pressure tested to assure watertightness.
[2] The required setback shall be 50 feet where the applicant has provided hydrogeologic
data acceptable to the Approving Authority demonstrating that the location of the soil
absorption system is hydraulically downgradient of the vernal pool. Surface topography alone
is not determinative.
[3] Surface or subsurface drains which will regularly or periodically intercept the seasonal
high groundwater table and carry that groundwater away from an area must meet the
specified setbacks.
[4] The setback distance shall be measured from a naturally-occurring downhill slope which
is not steeper than 3:1 (horizontal:vertical). A minimum 15 foot horizontal separation
distance shall be provided between the top of the two inch layer of c to ½ inch washed stone
above the pipe, or the geotextile material above the pipe or the top of the chamber and the
adjacent downhill slope. For a system located in an area with any adjacent naturally
occurring downhill slope steeper than 3:1, slope stabilization shall be provided in accordance
with best engineering practice which may include construction of a retaining wall designed
by a Massachusetts Registered Professional Engineer.
[5] Locating a system component or any part thereof beyond a property line of the facility,
whether pursuant to an easement or otherwise, requires a variance issued in accordance with
310 CMR 15.410, except that the placement of fill or grading material beyond the property
line of the facility, pursuant to an easement or otherwise, shall not require a variance under
310 CMR 15.410.
(2) No system shall be constructed within a Zone I of a public water supply well or wellfield.
No system shall be upgraded or expanded within a Zone I of a public water supply well or
wellfield unless a variance is granted pursuant to 310 CMR 15.410 through 15.415.
(3) All setback distances from water bodies shall be measured from the bank of the water body.
All setback distances from wetlands shall be measured in accordance with the criteria of the
Wetlands Protection Act and 310 CMR 10.00: Wetlands Protection, from the most landward
edge of the following features: bordering vegetated wetland as defined in 310 CMR 10.55(2):
Definition, Critical Characteristics and Boundary; salt marsh as defined in 310 CMR 10.32(2):
Definitions; top of inland bank as defined in 310 CMR 10.54(2): Definition, Critical
Characteristics and Boundary; or top of coastal bank as defined in 310 CMR 10.30(2):
Definition. In the event of disputes concerning landward boundary of resources subject to the
Wetlands Protection Act, the boundary shall be as delineated by the municipal Conservation
Commission or the Department in accordance with 310 CMR 10.00: Wetlands Protection, and
relevant interpretive guidance documents.