310 CMR 15.255
Construction in Fill
(1) Any system where fill is required to replace topsoil, peat or other unsuitable or impervious
soil layer above the requisite four feet of naturally occurring pervious material is a system
constructed in fill. Any system constructed in fill which extends either wholly or partially above
natural grade for the purpose of complying with 310 CMR 15.212 (depth to groundwater) is a
mounded system. All soil absorption systems constructed in fill shall be sized using the soil
class of the underlying naturally occurring pervious material.
(2) The finished side slopes of a mounded system shall not be steeper than 3:1
(horizontal:vertical). A minimum 15 foot horizontal separation distance shall be provided
between the soil absorption area and the adjacent side slope as measured from the edge of the
top of the two inch layer of c to ½ inch washed stone aggregate or geotextile fabric cover. The
toe of the slope shall be a minimum of five feet from any property line, or a swale or other
drainage system directing runoff away from the adjacent property shall be installed. Adjustments
to the above horizontal separation may be allowed if a suitable impervious barrier is installed to
prevent potential sewage breakout. The impervious barrier shall meet the following
requirements:
(a) the impervious barrier shall be designed by a Massachusetts Registered Sanitarian or a
Massachusetts Registered Professional Engineer.
(b) construction of the impervious barrier shall be supervised by the designer.
(c) prior to issuance of a Certificate of Compliance, the applicant shall submit to the
Approving Authority an as-built plan prepared and certified by the designer that the
impervious barrier has been constructed in accordance with the approved design plan.
(d) the elevation of the top of the impervious barrier shall be no lower than the "breakout"
elevation, which is the elevation of the top of the two inch layer of c inch to ½ inch washed
stone aggregate cover.
(e) the recommended distance from the impervious barrier to the edge of the soil absorption
system closest to the barrier should be at least ten feet.
(f) where a retaining wall to stabilize the slope is required and also is proposed as an
impervious barrier, in addition to meeting the requirements in 310 CMR 15.255(2), it shall
be constructed of suitable structural material and be designed by a Massachusetts Registered
Professional Engineer.
(3) Fill material for systems constructed in fill shall consist of select on-site or imported soil
material. The fill shall be comprised of clean granular sand, be free from organic matter and
deleterious substances, and shall not contain Remediation Waste as that term is defined in
310 CMR 40.0000. Mixtures and layers of different classes of soil shall not be used. The fill
shall not contain any material larger than two inches. A sieve analysis, using a #4 sieve, shall be
performed on a representative sample of the fill. Up to 45% by weight of the fill sample may be
retained on the #4 sieve. Sieve analyses also shall be performed on the fraction of the fill sample
passing the #4 sieve, such analyses must demonstrate that the material meets each of the
following specifications:
SIEVE SIZE
EFFECTIVE
% THAT MUST
PARTICLE SIZE
PASS SIEVE
# 4
4.75 mm
100%
# 50
0.30 mm
10% - 100%
#100
0.15 mm
0% - 20%
#200
0.075 mm
0% - 5%
A plot of the sieve analyses of the portion of the sample passing the #4 sieve shall fall on or
between the lines on the following graph:
(4) If required by the Approving Authority, a minimum of one representative sample shall be
taken from the in-place fill for a system serving a single family residence and tested for
compliance with the grain size distribution specification. One soil test per pit per removal day
shall be required for systems with design flows of 2,000 gpd or more.
(5) Where fill is required to replace unsuitable or impermeable soils, the excavation of the
unsuitable material shall extend a minimum of five feet laterally in all directions beyond the
outer perimeter of the soil absorption system to the depth of naturally occurring pervious
material as required by 310 CMR 15.240 (soil absorption systems) and replaced with fill material
meeting the specifications of 310 CMR 15.255(3).
(6) Prior to placement of the fill, which shall be stockpiled at the edge of the excavation and
filled in gradually, the bottom surface of the excavation shall be scarified and relatively dry. Fill
shall not be placed during rain or snow storms. If the groundwater elevation is above the
elevation of the bottom of the excavation, the excavation shall be dewatered prior to placement
of the fill.