310 CMR 19.011
Signatories, Certification and Engineer's Supervision
(1) Signatories and General Certification. Any application for a permit, authorization to
construct, authorization to operate, permit modification, and any determination, certification,
report and any other document submitted to the Department pursuant to 310 CMR 19.000, shall
be signed by the appropriate responsible official. Any person required by 310 CMR 19.000 or
any order or other enforcement document issued by the Department, to submit any document to
the Department shall identify himself or herself by name, profession, and relationship to the
applicant and legal interest in the facility, and make the following statements:
I, [name of responsible official], attest under the pains and penalties of perjury that:
(a) I have personally examined and am familiar with the information contained in this
submittal, including any and all documents accompanying this certification statement;
(b) based on my inquiry of those persons responsible for obtaining the information, the
information contained in this submittal is, to the best of my knowledge, true, accurate,
and complete;
(c) I am fully authorized to bind the entity required to submit these documents and to
make this attestation on behalf of such entity; and
(d) I am aware that there are significant penalties, including, but not limited to, possible
administrative and civil penalties for submitting false, inaccurate, or incomplete
information and possible fines and imprisonment for knowingly submitting false,
inaccurate, or incomplete information; and
(e) (for a responsible official submitting a third-party inspection report pursuant to
310 CMR 19.018(8)(b)1.) The facility [name of facility] provided any information
required by 310 CMR 19.018 and requested by the third-party inspector in a timely
fashion and any employee or contractor of [name of facility] did not unduly influence the
third-party inspector; and
(f) (for a responsible official submitting a transfer station certification pursuant to
19.035(4)):
1. I have accurately stated whether the transfer station is in compliance with its
permit and all other applicable requirements in 310 CMR 16.00: Site Assignment
Regulations for Solid Waste Facilities and 19.000 including, but not limited to,
310 CMR 19.043;
2.I have accurately identified any and all violations of 310 CMR 16.00: Site
Assignment Regulations for Solid Waste Facilities or 19.000 or the terms and
conditions of any permits or other approvals issued thereunder by the
Department;
3. If the transfer station is not in compliance, I have stated what the owner and
operator will do to return the transfer station to compliance and the date by which
compliance will be achieved; and,
4. Plans and procedures to maintain compliance are in place at the transfer
station and will be maintained even if processes or operating procedures are
changed.
(2) Engineering Supervision. 310 CMR 19.011(2) does not apply to any documents submitted
to the Department pursuant to 310 CMR 19.018. All papers pertaining to design, construction,
operation, maintenance, or engineering of a site or a facility shall be completed under the
supervision of a Massachusetts registered professional engineer knowledgeable in solid waste
facility design, construction and operation and shall bear the seal, signature and discipline of said
engineer. The soils, geology, air modeling, air monitoring and groundwater sections of an
application or monitoring report shall be completed by competent professionals experienced in
the fields of soil science and soil engineering, geology, air modeling, air monitoring and
groundwater, respectively, under the supervision of a Massachusetts registered professional
engineer. All mapping and surveying shall be completed by a registered surveyor.