310 CMR 23.05
Performance Standards
(1) No renovation shall be permitted if it would adversely impact the habitat of rare animal or plant
species as determined by the Natural Heritage and Endangered Species Program or the Department.
No alteration of a vernal pool shall be allowed.
(2) All activities shall be conducted in accordance with U.S.D.A. Natural Resources Conservation
Services (NRCS) Standards and best management practices, available from the Massachusetts
Cranberry Experiment Station as approved by NRCS, as applicable. The cranberry operation shall
have a Conservation Farm Plan approved by the NRCS prior to application for renovation activities.
(3) A tail water recovery system shall be established as necessary to protect water quality
downstream. The systemshallbe able to retain on site a volume of water equal to the capacity of the
bogfor at least five days prior to discharging into a pond, river, or wetland. A by-pass canal shall be
constructedandmaintainedasnecessary to isolate naturally flowing water away from the bog area. The
by-pass canal shall be constructed within the existing dike system or in an upland area. Bypass canals
shall be provided with fish passage structures or adequate flows to protect anadromous fish runs.
(4) No cranberry bog renovation activities whichwillproduce siltationor obstruct flows are allowed
between March 1 and June 30 or between September 1 and October 31 in areas with anadromous
fish runs as identified by the Division of Marine Fisheries. Water intake structures on anadromous fish
runs shall have screens with a maximum of ¼ inch mesh and intake velocities cannot exceed ½ cubic
foot per second. Adequate flows and water quality shall be maintained during spawning and down
running periods of anadromous fish.
(5) No cranberry bog renovation activities shall cause an increase inflood elevations on adjacent or
other downstream properties. To conserve water within the bog, the construction should be laser
leveled or its equivalent to six inches.
(6) Renovation of abandoned cranberry bogs shall not result in any filling of wetlands or water bodies
except that which necessarily occurs as a result of normal renovation practices or the repair or
replacement of dikes and water control structures. Alteration of bordering vegetated wetlands that
were not in agriculturaluse onor before January 1, 1959 is prohibited. Any fill shall be composed of
suitable material and properly maintained to prevent erosion or other nonpoint sources of pollution.
All permanent and temporary alterations shall be properly stabilized to prevent erosion.
(7) Renovation of an abandoned cranberry bog shall include mitigation to protect wildlife habitat by
one or a combination of the following:
(a) 1:1 replication for wetlands altered. The replacement area must be substantially equivalent to
the abandoned bog in terms of ground and surface water elevations, horizontalconfiguration, and
general location. At least 75% of the surface area shall be reestablished with indigenous wetland
plant species within two growing periods;
23.05: continued
(b) implementation of a wildlife habitat enhancement planapproved inwriting by the Department
and designed to promote wildlife habitat to compensate for the habitat lost to renovation activities;
or
(c) for every acre of renovated bog, an equal or greater area of undisturbed land or land managed
to enhance wildlife habitat values is protected from development through a conservation restriction
for the duration of cranberry production at the cranberry bog.
(8) Any activities must be directly related to the cultivation and harvesting of cranberries. If a
renovated bog is subsequently abandoned, the natural hydrology shall be restored.
(9) Activities shallnot be permitted in the rare circumstances that the criteria of 310 CMR 23.05(1)
through (8) are met but the renovation will result in substantial adverse effects on the interests identified
in St. 1996, c. 258.