310 CMR 30.512
Required Notices
(1) The owner or operator of a facility that has arranged to receive hazardous waste, other than
State-only hazardous waste, from a source outside the United States should be aware of the need
to notify the Regional Administrator of EPA in writing at least four weeks in advance of the date
the hazardous waste is expected to arrive at the facility pursuant to 40 CFR 264.12. The owner
or operator of a facility that has arranged to receive State-only hazardous waste from a source
outside the United States shall notify the Department in writing at least four weeks in advance
of the date the hazardous waste is expected to arrive at the facility. Advance notice of subsequent
shipments of the same type of waste from the same source is not required.
(2) The owner or operator of a facility that receives hazardous waste from an off-site source
shall inform the generator in writing prior to the first shipment that he has the appropriate license
and will accept the waste the generator is shipping. The owner or operator shall keep a copy of
this written notice as part of the operating record of the facility. The owner or operator shall also
inform the generator, in writing, within seven days of receiving notice from the Department of
any change in the facility's license status that affects the facility's authority to accept the
generator's waste.