310 CMR 40.0027
Remedial Monitoring Report
(1) For a disposal site for which the requirement to submit Remedial Monitoring Reports
applies as of April 3, 2006, the first Remedial Monitoring Report shall be submitted:
(a) in accordance with 310 CMR 40.0425(7)(a) when the remedial action that involves
Active Operation and Maintenance is addressing an Imminent Hazard or Condition of
Substantial Release Migration; or
(b) concurrently with the submittal of the next Status Report following the commencement
of the remedial action that involves Active Operation and Maintenance when the remedial
action is addressing conditions that do not pose an Imminent Hazard or Condition of
Substantial Release Migration.
40.0027: continued
(2) Except as provided at 310 CMR 40.0027(3), a Remedial Monitoring Report shall document
all monitoring and operational information relevant to the Active Operation and Maintenance
of an Active Remedial System, Active Exposure Pathway Mitigation Measure or Active
Remedial Monitoring Program during the reporting period and since the submittal of any
previous Remedial Monitoring Report. Such information includes, as applicable:
(a) operating status of Active Remedial Systems or Active Exposure Pathway Mitigation
Measure, including any system shutdown and the date/duration of shutdown;
(b) date(s) and number of monitoring events;
(c) effluent concentrations;
(d) identification of any discharges above permissible discharge concentrations;
(e) recovery rates and/or volumes;
(f) discharge volumes;
(g) date, location, type, and volume of Remedial Additives applications;
(h) groundwater data;
(i) pressure measurements; and/or
(j) related maps, graphs or diagrams.
(3) Remedial Monitoring Reports shall not be required for:
(a) Active Operation and Maintenance that is limited to window fans deployed as a
temporary measure to vent vapors within a building, provided that information related to the
operation of such window fans shall be included in the next applicable Status Report; or
(b) Active Operation and Maintenance of an Active Exposure Pathway Mitigation Measure
implemented as a Permanent Solution with Conditions after the submittal of a Permanent
Solution Statement and operated and maintained pursuant to 310 CMR 40.1025.
(4) Except as provided in 310 CMR 40.0027(3), Remedial Monitoring Reports shall be required
until the Active Operation and Maintenance of an Active Remedial System, Active Exposure
Pathway Mitigation Measure or Active Remedial Monitoring Program is terminated.
(5) Remedial Monitoring Reports shall be submitted to the Department electronically on a form
established by the Department for such purposes. The date of receipt of a Remedial Monitoring
Report by the Department shall be determined as specified in 310 CMR 40.0008(4).