310 CMR 40.0859
Selection of Remedial Action Alternative
(1) Except as provided in 310 CMR 40.0857(2), remedial action alternatives shall be selected
based on the detailed evaluation criteria contained in 310 CMR 40.0858 and in compliance with
the provisions set forth in 310 CMR 40.0850, 40.0900 and 40.1000.
(2) A remedial action alternative which is a Permanent Solution shall be selected if a feasible
Permanent Solution has been identified and its implementation is found to be more cost-effective
and timely than would be the implementation of a Temporary Solution.
(a) If there is no such feasible Permanent Solution, a Temporary Solution shall be selected
and implemented and a plan shall be prepared pursuant to 310 40.0861(2)(h) for the
identification and development of a Permanent Solution.
(b) Where a Permanent Solution for the entire disposal site is not feasible, the evaluation
of remedial alternatives may consider remedial action alternatives to achieve a Permanent
Solution at one or more portions of the disposal site.
(3) Any selected Permanent Solution shall, to the extent feasible, reduce the concentrations of
oil and hazardous material in the environment to levels that achieve or approach background.
(4) An Engineered Barrier, cap or other remedial action alternative that relies upon on-site
disposal, isolation, or containment of oil and/or hazardous material shall not be selected, unless
and until a Phase III evaluation performed pursuant to the provisions of 310 CMR 40.0850
demonstrates the lack of a feasible alternative.