310 CMR 80.34
Requirements for Compliance Certification
(1) Certification Form. The Owner or Operator of a UST system shall submit, to the
Department, a compliance certification in accordance with 310 CMR 70.00: Environmental
Results Program Certification, no earlier than 16 months and no later than 18 months from the
UST facility compliance date or the date of the most recent third-party inspection report
submission, whichever is earlier. The compliance certification shall be submitted in a format
specified by the Department. The Owner or Operator shall certify whether or not the Owner or
Operator has complied with the following requirements:
(a) Financial responsibility obligations in accordance with 310 CMR 80.51 through 80.63;
(b) All testing requirements for leak detection, sumps, spill buckets, overfill prevention, and
corrosion protection in accordance with 310 CMR 80.20 through 80.22 and 80.26 through
80.29;
(c) All registration, reporting and recordkeeping requirements in accordance with 310 CMR
80.23 and 80.36;
(d) Emergency procedure requirements in accordance with 310 CMR 80.25;
(e) That cathodic protection readings have been taken and recorded in accordance with
310 CMR 80.29(4)(b), as applicable;
(f) A demonstration that all Class A, B and C operators are certified in accordance with
310 CMR 80.37;
(g) For all sump, spill bucket and overfill prevention equipment inspections in accordance
with 310 CMR 80.27 and 80.28;
(h) That all repairs and replacements have been completed in accordance with 310 CMR
80.33; and
(i) That the UST components and configuration of the UST system and UST components
have not changed. If the UST system or UST component has changed, completion and
submission of an amended registration form to the Department in accordance with 310 CMR
80.23(1).
(2) Return to Compliance. At the time of submission, if the Owner or Operator is out of
compliance with any of the requirements on the Certification Form, the Owner or Operator shall
submit a Return to Compliance (RTC) Plan with the Certification Form that details what the
Owner or Operator will do to return to compliance and the date by which compliance will be
achieved. The RTC Plan shall include, but not be limited to, actions the Owner or Operator has
taken or will take to come into compliance and remain in compliance with the requirements of
310 CMR 80.00.
(a) The deficiencies identified in the RTC plan shall be corrected within 30 days of the
submittal of the Certification Form, unless the RTC plan documents a reasonable basis for
why more time is needed to correct the deficiencies and provides an anticipated completion
date.
(b) If the Department determines that the proposed completion date is not reasonable, the
Department shall notify the Owner or Operator that deficiencies shall be corrected by a date
earlier than the proposed date.
(c) The Owner or Operator shall notify the Department, in a format specified by the
Department, when the deficiencies are corrected.
(3) Certification for Temporarily Out-of-service UST System. The Owner or Operator of a
UST system that is temporarily out-of-service shall certify compliance with the requirements at
310 CMR 80.42(4).
(4) New or Newly Regulated UST Facility. If a UST facility is installed or becomes subject to
310 CMR 80.00 after January 2, 2015, the compliance certification statement is due to
Department no earlier than 16 months and no later than 18 months after the date of registration
in accordance with 310 CMR 80.23.
(5) Certification Statement. The Owner or Operator shall comply with the Certification
Statement requirements at 310 CMR 70.03(2): Certification Statement, except that 310 CMR
70.03(2)(b) and (c) shall not apply.