314 CMR 20.11
Required Submissions for Reclaimed Water Permit Applications
All applications for a permit to construct, install, modify, operate or maintain a reclaimed
water system in accordance with 314 CMR 20.00 shall include an Engineering Report, a Reuse
Management Plan, and, if the applicant proposes that the reclaimed water by used by one or more
persons other than the permittee, Service and Use Agreement(s). For permit renewals and
modifications, the applicant may update existing documents. All documents other than the
Service and Use Agreement(s) shall be completed in accordance with relevant Department
design guidelines and shall be prepared, stamped and signed by a Massachusetts Registered
Professional Engineer with a concentration in civil, sanitary or environmental engineering,and
shall be accompanied by a Certification Statement that the documents have been prepared in
accordance with Department standards and signed by the Massachusetts Registered Professional
Engineer. The documents shall be consistent with 314 CMR 20.00. If reclaimed water is
proposed to be used within the Zone II or Interim Wellhead Protection Area of a ground water
source of potable water for a public water system, the applicant shall notify the public water
system in writing by certified mail, and include a copy of said notice with the application.