314 CMR 3.14
Transfer of Permits
(1) RCRA Facilities. Any permit which authorizes the operation of a RCRA facility subject
to the requirements of 314 CMR 8.07 shall be valid only for the person to whom it is issued and
may not be transferred. Operation by an owner or operator other than those named in the permit
shall be a violation of 314 CMR 3.00 and a basis for revocation of the permit, or for other
enforcement action.
(2) Transfers by Modification. Except as provided in 314 CMR 3.14(1) and (3), and 314 CMR
3.06, a permit may be transferred by the permittee to a new owner or operator only if the permit
has been modified or revoked and reissued under 314 CMR 3.13(1) and (2), or a minor
modification made under 314 CMR 3.13(3)(d) to identify the new permittee.
(3) Automatic Transfers. As an alternative to transfers under 314 CMR 3.14(2), any permit
may be automatically transferred to a new permittee if:
(a) The current permittee notifies the Department at least 30 days in advance of the
proposed transfer date in 314 CMR 3.14(3)(b).
(b)
The notice includes a written agreement between the existing and new permittees
containing a specific date for transfer of permit responsibility, coverage, and liability between
them; and
(c) The Department does not notify the existing permittee and the proposed new permittee
of the Department's intent to modify or revoke and reissue the permit. A modification under
314 CMR 3.14(3) may also be a minor modification under 314 CMR 3.13(3). If this notice
is not received, the transfer is effective on the date specified in the agreement mentioned in
314 CMR 3.14(3)(b).