314 CMR 5.07
Effect of a Permit
Issuance of an individual permit or coverage under a general permit under 314 CMR 5.00 and
2.00: Permit Procedures shall be deemed to allow, to the extent specified in the permit and
314 CMR 5.07, the permittee to discharge pollutants to ground waters of the Commonwealth,
and to construct, install, modify, operate and maintain an outlet for such discharge, together with
any treatment works required to meet effluent limitations or other requirements specified in the
permit for such discharge. Issuance of an individual permit under 314 CMR 5.00 and 2.00 shall
also be deemed to allow, to the extent specified in the permit and 314 CMR 20.00: Reclaimed
Water Permit Program and Standards, the permittee to construct, install, modify, operate, and
maintain a reclaimed water system, and to use, sell, distribute, and offer for use, sale or
distribution, the reclaimed water produced by the system in accordance with the permit and
314 CMR 20.00. Issuance of an individual permit or coverage under a general permit pursuant
to 314 CMR 2.00: Permit Procedures and 5.00 does not relieve the permittee of its obligation
to comply with all applicable, Federal, State, and local laws and regulations.