330 CMR 22.05
Application Procedures
(1) Application to Department. Application to the Department to enroll a Project in the
Program shall be made on a form prescribed by the Department and approved by the ALPC. An
Application shall be submitted by the Applicant to the Commissioner and a copy shall also be
submitted to the chief executive officer of the Municipality in which the Project is located If the
Project is located in more than one Municipality, a single Application covering the entire Project
shall suffice, copies of which shall be submitted by the Applicant to the chief executive officer
of each Municipality. The chief executive officer shall distribute a copy of the Application to
the agencies and officials identified in 330 CMR 22.05(4)(a).
(2) Project Information and Description. The Application shall contain, at a minimum, the
following information:
(a) Deed references, assessor's map, and any and all liens, encumbrances, and easements on
the Project;
(b) A delineation of the Project boundaries as depicted on a United States Geological
Survey (USGS) topographic map showing the Project as well as any excluded contiguous
acreage under the same ownership;
(c) Copies of any existing surveys and aerial photography of the Project;
(d) A United States Department of Agriculture (USDA) Natural Resources Conservation
Services (NRCS) soils map showing a breakdown of the Project's various soil types and
acreage possessing soil capability Class I through VIII as well as prime farmland, soils of
state or local significance, and unique soils;
(e) A full description of all commercial agricultural uses and activities occurring on the
Project including, without limitation, type of crop, acreage devoted to each crop, type and
quantity of livestock, and acreage of associated pasture;
(f) A written statement to the Department describing short and long term plans for keeping
the land in active Agriculture; and
(g) Statement by Applicant consenting to allow the Department, an agent of the Department,
or a Partner Agency to conduct an inspection of the Project, including soil testing limited to
agricultural and septic suitability.
(3) Disclosure. If a Municipality is to provide funds or other assistance as set forth in
M.G.L. c. 20, § 23 toward the purchase of the APR, or if otherwise required by the Public
Records Law, the Department may be required to disclose information provided to the
Department.
(4) Municipality Participation. The chief executive officer of the Municipality may provide the
following information to the Department with a copy to Applicant Failure of a Municipality to
supply such additional information shall not be construed as preventing the ALPC's
consideration of such Project:
(a) Comments or recommendations from, but not limited to, the following agencies and
officials as may be appropriate: Agricultural Commission, Conservation Commission,
Planning Board, the chief executive officer, and chief administrative officer. The comments
may include the compatibility of the Project with zoning by-laws, open space plans, natural
resource inventories, and other relevant considerations; and
(b) A statement signed by the chief executive officer of the Municipality expressing the
interest of the Municipality, or lack thereof, in providing funds or other assistance if the
Project is approved by the Department.