360 CMR 10.084

Costs and Liability

Year: 2026Length: 67 wordsOfficial source
All costs and expenses incident to the application, design, installation, connection, modification, reconnection, abandonment, and maintenance of a direct connection shall be borne by the owner of the connection. The owner shall indemnify the Authority for any loss, damage, or liability directly or indirectly caused or contributed to by the design, installation, connection, modification, reconnection, abandonment, maintenance, or use of the connection. TEMPORARY CONSTRUCTION SITE DEWATERING PERMITS
360 CMR 10.084: Costs and Liability | Justis AI