360 CMR 12.10
Annual Reports
(1) Each community shall file annual reports on its leak detection and repair program activities with
the Authority. The Authority will assist each community in completing its annual report. On January
1st ofeachyear, the Authoritywillgive written notice to each community of the requirement to submit
to the Authority the community's annual report. The annual report will be filed by March 1st each year.
12.10: continued
(2) The Authority will provide any written comments on each annual report within 30 days of its
receipt by the Authority.
(3) The annual report will contain the following information regarding leak detection:
(a) a calculation, on the form attached to 360 CMR 12.00 as Appendix "A", of unaccounted-for
water and leakage potential for the previous calendar year;
(b) if the community has done district measurement, flow measurement results; and
(c) a schedule of planned leak survey activity for the then-current calendar year, specifying:
1. the pipe mileage to be surveyed;
2. the names and qualifications of the personnel who will conduct those planned leak survey
efforts; and
3. a brief description of the sonic leak detection equipment to be used.
(4) The Authority shall file an annual report with the communities by June 30th each year. The
Authority'sreportshallprovide a summary of all leak detection and repair activities conducted by it and
the communities during the previous calendar year.