503 CMR 3.06
Procedures
(1) Application Process. Eligible parties shall make application to the Board for a grant using
the form and format required by the Board for this purpose. The application shall include a detail
of either the actual costs incurred for the Closure, removal and/or replacement of the Fuel
Storage Tank(s) System or an estimate of expected costs. Both actual and expected costs shall
be documented with invoices from contractors qualified to do the work and/or cost estimates
from at least two contractors qualified to do the work, in accordance with the requirement of
310 CMR 80.00: Underground Storage Tank (UST) Systems, particularly 80.16: Installation
Requirements. Where cost estimates are submitted, the UST Board will pay up to 50% of the
amount of the lowest cost estimate. Additional information may be required to enable
classification and priority point scoring. Such information may include a description of the work
intended or completed and for which reimbursement is being requested, along with documented
costs or cost estimates. In no event will costs in excess of the maximums stated in 503 CMR
3.04 and 3.08 be reimbursed. Documentation that the work has been completed must be
submitted to the Board. Work must be completed prior to application to the Board or must be
completed and all documentation submitted to the Board within a 12-month period from the date
of application filing. An application for work not completed and all documentation submitted
within a 12-month period from the date of application filing will lose its classification and
priority ranking, as set forth in 503 CMR 3.07.
(2) Payment Procedure. Grants shall be awarded after the work has been completed.