522 CMR 3.06
Miscellaneous Provisions
(1) The owner of a nuclear power plant shall provide a procedure by which all agency reports
and data sheets shall be coordinated to the satisfaction of the Chief or his or her designee.
1/17/25
522 CMR - 11
(Mass. Register #1539, 1/17/2025)
522 CMR: BOARD OF BOILER RULES
3.06: continued
(2) Pressure Tests.
(a) An Authorized Nuclear Inspector may require a pressure test to determine the extent of
a defect or detrimental condition found in a Pressure Vessel. Such test shall be performed
in accordance with the 2021 NBIC Part 2 Inspection, and 2021 ASME Boiler and Pressure
Vessel Code, Section III, Rules for Construction of Nuclear Facility Components.
(b) The maximum metal temperature is not to be more than 120EF, unless the Authorized
Nuclear Inspector agrees to a temperature higher than 120EF.
(c) When the contents of the vessel prohibit contamination by any other medium or when
a hydrostatic test is not possible, other testing media may be required by the Authorized
Nuclear Inspector, provided that the precautionary requirements in the NBIC are followed.
1/17/25
522 CMR - 12