522 CMR 9.04
Inspection
Application. Whoever owns or uses or causes to be used a Refrigeration or Air
Conditioning System that comes within the scope of M.G.L. c. 146, § 45A, shall make
application for inspection prior to installation and operation to the Division in a format approved
by the Chief.
(Mass. Register #1539, 1/17/2025)
(2) Annual Inspections. When a Refrigeration or Air Conditioning System is installed, a field
inspection shall be performed before it is put into service, and the Refrigeration or Air
Conditioning System shall be inspected annually thereafter by a District Engineering Inspector
or an Authorized Inservice Inspector.
Refrigerant detector(s), alarm(s) and the refrigeration mechanical room ventilating systems
shall be tested annually and in accordance with manufacturer’s specifications. Records
supporting that such periodic testing was performed on Refrigeration Systems 20 tons capacity
or greater shall be made available upon request by a District Engineering Inspector or an
Authorized Inservice Inspector during the annual inspection.
(3) Prescribed Pressure. A refrigeration or air conditioning system shall not be operated in
excess of the prescribed pressure. If the refrigeration or air conditioning system is constructed
and installed in accordance with 522 CMR prescribed by the Board, the District Engineering
Inspector or Authorized Inspector shall issue a Certificate stating the maximum pressure at which
the system will be permitted to operate.
(4) Certificate to Be Posted.
(a) The Department shall issue to the Owner/User of a Refrigeration or Air Conditioning
System compliant with 522 CMR a Certificate, on condition that the appropriate fees have
been paid. The Certificate shall be protected from dirt, moisture, and contamination and
shall be posted in a conspicuous place near where the Refrigeration or Air Conditioning
System specified therein is located and shall be kept with said Refrigeration or Air
Conditioning System, and shall be always accessible to the District Engineering Inspector
or Authorized Inservice Inspector.
(b)
The Certificate shall include the name of the Authorized Inspection Agency, the
National Board number, the Mass Tag number, the name of the manufacturer, the name of
the owner or user, the location, size and number of the Refrigeration or Air Conditioning
System, the date of inspection and the maximum pressure at which it may be operated, with
the signature of the inspector, and shall contain such extracts from the statutes as shall be
deemed necessary by the board.
(c) The Certificate shall remain posted while the Certificate is in force, unless a District
Engineering Inspector or an Authorized Inservice Inspector deems the Refrigeration or Air
Conditioning System or its Appurtenances unsafe or dangerous. If a Refrigeration or Air
Conditioning System is determined to be unsafe or dangerous, the District Engineering
Inspector or Authorized Inservice Inspector shall remove the Certificate, and submit such
certificate to the Chief, and the Refrigeration or Air Conditioning System shall not be
operated until such time that a valid Certificate is reissued.
(5) Inspection Reporting. Pursuant to M.G.L. c. 146, § 45A, whoever owns, or uses or causes
to be used, any Refrigeration or Air Conditioning System, shall report in writing to the Chief the
location of such Refrigeration or Air Conditioning System, before the work of installation of
such Refrigeration or Air Conditioning System, and annually thereafter; provided, that the
Owner/User of an insured Refrigeration or Air Conditioning System shall report immediately in
writing to the Chief whenever the Authorized Inspection Agency ceases for any cause to inspect
the Boiler.
(6) Reporting by Authorized Inspection Agency.
(a) Pursuant to M.G.L. c. 146, § 45A, every Authorized Inspection Agency shall forward
to the Chief, within 14 days after each inspection, reports of all Refrigeration and Air
Conditioning Systems inspected by the Authorized Inservice Inspectors. Such reports shall
be made on a form, and submitted to the Division in a format approved by the Chief and shall
contain all orders made by the company regarding such Refrigeration or Air Conditioning
Systems.
(b) All Authorized Inspection Agencies shall notify the Chief, within 14 days, on a form and
submitted in a format approved by the Chief, of all new business or discontinuation of
business regarding coverage of registered Refrigeration and Air Conditioning Systems. All
Authorized Inspection Agencies shall report immediately to the Chief in writing the name
of the Owner/User and the location of every Refrigeration and Air Conditioning System
required to be inspected by M.G.L. c. 146, § 45A, upon which they have cancelled or refused
insurance, giving the reasons therefor.
(c) The Authorized Inspector shall notify the Chief or his designee immediately in writing
if the Authorized Inspector finds that an unsafe and dangerous condition exists resulting in
the removal of the Certificate.
(d) Authorized Inspection Agencies shall report the location and owner’s information, and
the type and amount (pounds) of refrigerant used for all refrigeration and air conditioning
systems.
(7) Welding. All welding done on any Refrigeration or Air Conditioning System or piping
covered by 522 CMR 9.00 shall be performed by a welder qualified according to the 2021 ASME
Boiler and Pressure Vessel Code Section IX, Welding, Brazing and Fusing Qualifications.
Electrical. A person holding a license as a refrigeration technician may connect or
disconnect for the purpose of installation, alteration, repair or replacement, any device or control
required by rules and regulations of the Board to be a part of a refrigeration or air conditioning
installation, or being an integral part of the refrigeration or air conditioning equipment at the
connection on such device, control or part to be repaired or replaced, from the first disconnect
in. The first disconnect is the wall plug or nearest electrical disconnect to the refrigeration or air
conditioning equipment.
(9) Plumbing. An individual who is licensed in compliance with M.G.L. c. 146, § 85 as a
refrigeration technician may connect or disconnect for the purpose of alteration, repair or
replacement of controls downstream of the equipment gas shutoff valve any device or control
that is regulated by 522 CMR or is an integral part of the refrigeration or air conditioning
equipment.