700 CMR 8.06(4)

Table 1. The Department specifies on the application the time and manner of payment.

Year: 2026Length: 85 wordsOfficial source
Table 1 Type of Permit Fee Irreducible Load Permit Exceeding Any Legal Limit for Size and Weight Pursuant to 700 CMR 8.00 $400.00 - Annually Irreducible Load Permit Exceeding Any Legal Limit for Size and Weight Pursuant to 700 CMR 8.00 $40.00 - Per Trip Super Load Weight >130,000 pounds - Detailed Engineering Calculations Required $300.00 - Single Trip Reducible Load Permit Exceeding Any Legal Limit for Size and Weight Pursuant to 700 CMR 8.00 $50.00 per every 1,000 pounds exceeding the Federal Bridge Formula
700 CMR 8.06(4): Table 1. The Department specifies on the application the time and manner of payment. | Justis AI