105 CMR 120.071
Reporting of Events
(A) The licensee shall immediately notify the LLEA after determining that an unauthorized
entry resulted in an actual or attempted theft, sabotage, or diversion of a category 1 or category
2 quantity of radioactive material. As soon as possible after initiating a response, but not at the
expense of causing delay or interfering with the LLEA response to the event, the licensee shall
notify the Agency by telephone. In no case shall the notification to the Agency be later than four
hours after the discovery of any attempted or actual theft, sabotage, or diversion.
(B) The licensee shall assess any suspicious activity related to possible theft, sabotage, or
diversion of category 1 or category 2 quantities of radioactive material and notify the LLEA as
appropriate. As soon as possible but not later than four hours after notifying the LLEA, the
licensee shall notify the Agency by telephone.
(C) The initial telephonic notification required by 105 CMR 120.071(A) must be followed
within a period of 30 days by a written report submitted to the Agency by an appropriate method
listed in 105 CMR 120.054. The report must include sufficient information for Agency analysis
and evaluation, including identification of any necessary corrective actions to prevent future
instances.
PHYSICAL PROTECTION IN TRANSIT