810 CMR 4.13
Rating of Project Performance
(1) Standard Contractor Evaluation Form. The Standard Contractor Evaluation Form shall be
used to rate the Sub-bidder on a single Building Project according to criteria established by the
Commissioner for assessing the performance of the Sub-bidder on the project.
(2) Project Rating. The representative of the Awarding Authority or private Building Project
owner evaluating the Sub-bidder’s performance on the project shall score the Sub-bidder on each
performance criterion. The Sub-bidder’s Project Rating for the project shall be the total of the
scores given for each criterion.
(3) Average Project Rating. DCAM shall assign each Sub-bidder an Average Project Rating
which shall be the average of Project Ratings given to the Sub-bidder for all of the evaluated
Building Projects completed within the time frame established by M.G.L. c. 149. The Sub-
bidder’s performance on projects shall be considered satisfactory only if the Average Project
Rating meets or exceeds the minimum rating outlined in the Sub-bidder Guidelines.