980 CMR 10.02
Forecast Data Requirements
(1) Facility Need Requirement. The applicant shall provide a statement of need which will consist of:
10.02: continued
(a) a description of the ways in which the applicant's existing facilities will not be adequate to
serve the requirements forecasted;
(b) a description of the ways in which all other "no-build" alternatives and other supply alternatives
suchas pipeline systemexpansion, SNG, propane, etc. considered by the applicant would not be
adequate and preferred to serve the requirements forecasted; and
(c) for two or more sites, at least one of which must be in a non-urban area, a description of how
the facility/site proposed will be used to meet the requirements forecasted.
(2) Mapping Requirements.
(a) The applicant shall provide a map or series of maps of the preferred site and all alternative
sites proposed which show the following at a useful scale:
1. location of property
2. property boundaries and dimensions
3. major existing structures and equipment on the property
4. location of the following zones:
2
- 2,000 BTU/ft hr zone;
2
- 1,000 BTU/ft hr zone;
2
- 460 BTU/ft hr zone; and the
- vapor dispersion zone.
5. anticipated location and dimensions of the storage tank, new ancillary facilities, and dike
6. topography of the site out to and including the most distant zone specified in 980 CMR
10.02(2)(a)4.
7. current zoning scheme out to and including the most distant zone specified in 980 CMR
10.02(2)(a)4.
8. special land uses including agricultural land, parks, forests, recreational areas, and areas
designated by a governmental agency for protection as naturalpreserves or historic or scenic
districts out to and including the most distant zone specified in 980 CMR 10.02(2)(a)4.
9. location of all hospitals, schools, nursing homes and churches, and places of outdoor
assembly out to and including the most distant zone specified in 980 CMR 10.02(2)(a)4.
10. surface water and groundwater resources out to and including the most distant zone
specified in 980 CMR 10.03(2)(a)4.
11. population densities out to and including the most distant zone specified in 980 CMR
10.02(2)(a)4.
12. alternative truck routes from exit of nearest highway to site, showing local street names,
bridges and elevated roadways, underpasses and tunnels, unpaved roads, and all locations on
these routes requiring the exercise of additional caution. Information provided here should also
include a general demographic description of the area through which these routes will pass.
13. nearby gas pipelines and point of interconnection for new facility
14. sewers, subway tunnels, drainage systems, underground electrical systems, and allother
underground conduits out to and including the most distant zone specified in 980 CMR
10.02(2)(a)4. as well as for all truck routes specified in 980 CMR 10.02(2)(a)4.
(b) The applicant shall provide a system map, showing location of preferred and alternative sites.
(3) Demonstration of Conformity with Siting Standards.
(a) The applicant shall demonstrate quantitatively that the preferred site and all alternative sites
meet each siting standard contained in 980 CMR 10.03.
(b) All such demonstrations must be based upon the methods of calculation specified in980CMR
10.03.
(4) Alternative Sites Evaluation Matrices.
(a) Purpose - The purpose of the evaluation matrices is to provide a means by which the applicant
can demonstrate, in a standardized way, the bases upon which the preferred site was chosen from
among the alternative sites proposed.
(b) Methodology
1. Cost matrices
a. The cost matrices shall be assembled as follows:
FIGURE 1
CAPITAL COST MATRIX
FACTORS
SITE A
SITE B
Land Acquisition
Site Preparation
Structures and Improvements
LNG Processing Equipment
LNG Transportation Facilities
Other Equipment
TOTAL
$
$
$
$
FIGURE 2
ANNUAL COST MATRIX
FACTORS
SITE A
SITE B
Operating Expenses
Maintenance Expenses
TOTAL
$
$
$
$
b. Current dollar figures shall be estimated for each cost item.
c. The cost matrices must be accompanied by a narrative explaining the sources of the
estimated cost figures.
2. Environmental Matrix
a. The environmental matrix should be assembled as follows:
FIGURE 3
ENVIRONMENTAL MATRIX
SITE A
SITE B
FACTORS
COMPARATIVE RATING COMPARATIVE RATING
Ease of Acquisition
Climatology
Geology
Hydrology
Transportation Access
Ecological Sensitivity
Socioeconomics
Special Resources
Commitment
Other
- The ratings should be based upon the total number of sites proposed (number of sites = n).
The most preferred site for each factor should receive a rating of n. The site preferred next
should be rated n-1, and so forth.
- Reconnaissance level data may be employed in constructing the environmental matrix,
including existing studies and reports completed by public or private agencies. If such sources
are not available or adequate, site analyses must be conducted.
- The environmental matrix shall be accompanied by a narrative which references the sources
of the data used for each factor and an explanation of how these data were used to arrive at
the relative rating for each proposed site.
(c) Summary of Alternative Sites.
The applicant must synthesize from the matrices the
comparative costand environmentaldata for each alternative site, and discuss, in detail, the bases
upon which the preferred site was selected over the other proposed site or sites.