980 CMR 12.02
Procedures
(1) Application of Technology Performance Standards. Any petition for approval to construct a
generating facility that is filed for review pursuant to M.G.L. c. 164, § 69J¼ must include an analysis
of the proposed facility's expected emissions of the criteria and non-criteria pollutants listed in 980
CMR 12.03. Such analysis shall include a summary of the proposed facility's expected emissions, a
description of the modelling or other analyses used to derive the expected emissions, and where
performance guarantees are available from the equipment manufacturer, a description of the
performance guarantees. If the expected emissions of the proposed generatingfacilityexceed the levels
set forth in 980 CMR 12.03 for any pollutant or pollutants, the applicant also must provide the
information listed in 980 CMR 12.02(2) as part of its petition.
The Energy Facilities Siting Board may request copies of guarantees, work papers, or other
documents to verify expected generating facility emissions; however, applicants proposing the use of
fuel types that do not contain pollutants specified in the TPS and that when burned do not result in
pollutants specified in the TPS, will not be required to provide modelling or testing results, guarantees,
work papers or other similar documents with respect to those pollutants.
Emissions testing shall be conducted in accordance with the Massachusetts Department of
Environmental Protection's "Guideline for Source Emission Testing" and in accordance with U.S.
Environmental Protection Agency tests as specified in 40 CFR Part 60, Appendix A; 40 CFR Part 60,
Subpart GG; 40 CFR Parts 72 and 75; or in accordance with another methodology approved by the
Massachusetts Department of Environmental Protection.
(2) Additional Information Requirements. An applicant proposing to construct a generating facility
withone or more emissions in excess of the emission levels set forth in980 CMR12.03 must provide
the following additional information with its petition:
(a) The applicant shall document the reliability of the proposed generation technology throughout
the industry and evaluate the reliability of the proposed fuel supply in Massachusetts.
(b) The applicant shallprovide the costof the technology per megawatt hour (inclusive of capital
costs, operating and fuel costs, and decommissioning costs) relative to other fossilfuelgenerating
technologies.
(c) The applicant shall discuss how the proposed facility will enhance New England's energy mix
and prevent overdependence on one or more fuel sources.
(d) The applicant shall provide information comparing the overall environmental impacts
associated with the proposed facility with the overall environmental impacts of facilities using other
fossil fuel generating technologies.
(1) Technology Performance Standards for Criteria Pollutants. The following are the technology
performance standards for criteria pollutants:
Name of Pollutant
(Pounds per Megawatt-Hour Burning Primary
Fuel
100% base load at 50 degrees Fahrenheit)
Sulfur Dioxide
Nitrogen Oxides
Fine Particulates - PM10
Particulate Matter
Carbon Monoxide
Volatile Organic Compounds
(2) TechnologyPerformance Standards for Non-Criteria Pollutants. The following are the technology
performance standards for non-criteria pollutants:
Antimony
Arsenic
Beryllium
Cadmium
Chromium
Cobalt
Copper
Lead
Manganese
Mercury
12.03: continued
Nickel
Nickel Oxide
Phosphorus
Selenium
Vanadium
Vanadium Pentoxide
(3) Updating to the Technology Performance Standards. The Energy Facilities Siting Board will
update the technology performance standards as necessary to reflect improvements in fossil fuel
generating and control technologies. Any such updates or new technology performance standards will
not apply retroactively to a proposed generating facility with expected emissions that satisfied the
technology performance standards in effect on the date the applicant filed its petition for approval to
construct the facility.