980 CMR 15.05
Identification of Burdened Areas Intersecting the Specific Geographical Area of a Project Site or
Route.
For all Applications or petitions to construct facilities identified in 980 CMR 15.01(2), the
Applicant shall assess for each Proposed Site or Route and each Noticed Alternative Site or
Route, if any, whether the SGA intersects any Burdened Area pursuant to 980 CMR 15.04. This
is a threshold analysis that determines whether the Applicant shall continue with its CIA. The
Applicant conducts this assessment by doing the following:
(1) Identification of the Project SGA. For each Proposed Site or Route or Noticed Alternative
Site or Route, the Applicant shall use the following Facility Boundary and radial distances from
the Facility Boundary to determine the SGA:
(a) Facility Boundary. The SGA shall rely on the outermost boundary of the Project site
(such as a Project building or other structures, or the outermost areas of construction activity
or disturbance), or the Project fence line. For linear projects, or project components, such
as transmission lines or pipelines, the FacilityBoundaryshall be the edge of the right-of-way;
(b) Specific Geographical Area. For Projects that include multiple facility types (such as
transmission and distribution lines, and a battery energy storage system), the SGA is
determined using the Facility Boundary and the radial distance from the Facility Boundary
applicable to each component of the Project, as described in the table below.
Facility Type
Radial Distance from Facility
(or component of a Facility)
Boundary
Transmission and Distribution Line
(part of an LCTDIF or SCTDIF)
1/4 Mile
Clean Energy Storage Facility
(LCESF or SCESF)
1 Mile
Substation
(Part of an LCTDIF or SCTDIF)
1/2 Mile
Ground-Mounted Photovoltaics
(LCEGF or SCEGF)
1/2 Mile
Onshore Wind Facility or
Anaerobic Digester (LCEGF or
1 Mile
SCEGF)
1 Mile (no Air permit)
Liquefied Natural Gas Facility (§ 69J)
2 Miles (non-Major Air Permit)
Gas Pipeline (§ 69J)
1 Mile
2 Miles (non-Major Air Permit)
Fossil Generating Facility (§ 69J¼)
5 Miles (Major Air Permit)
1 Mile (no Air permit)
Gas Compressor Station
2 Miles (non-Major Air Permit)
(§ 69J, as part of a Gas Pipeline)
5 Miles (Major Air Permit)
(2)
Determine Whether the SGA Intersects with a Burdened Area. The Applicant shall
determine whether the SGA of the Project intersects with one or more Burdened Areas.
(3) Implications of the Burdened Area Assessment. If the SGA intersects with a Burdened
Area, the Applicant shall comply with the requirements of 980 CMR 15.06. If the Project SGA
does not intersect a Burdened Area, the Applicant shall:
(1) conclude the CIA and complete 980 CMR 15.09; and
(2) pursuant to 980 CMR 15.10, determine whether a Site Suitability Report is required,
and, if so, include a Site Suitability Report in the Project's Application to the Board.
Applicants should refer to the CIA Report Template for detailed information regarding the
preparation of a CIA Report. Applicants should refer to the Site Suitability Template for
detailed information regarding preparation of a Site Suitability Report.