990 CMR 16.03

Determination of Fee(s) Required

Year: 2026Length: 98 wordsOfficial source
The payment(s) made along with the Submission of the Notice of Intent shall be based on the initial estimated construction cost of the facility. The payment(s) made subsequent to Councildetermination that the Final Socio-Economic Appendix is adequate shall be determined bythe facility's construction cost, incorporating therequirements imposed on the facility's design by the negotiated siting agreement. In determining the fee(s), the Council 16.03: continued shall also take into account the cost imposed by the draft facility permit issued by the Department of Environmental Quality Engineering, pursuant to M.G.L. c. 21C, if such a draft permit has been issued.