990 CMR 16.03
Determination of Fee(s) Required
The payment(s) made along with the Submission of the Notice of Intent shall be based on the initial
estimated construction cost of the facility. The payment(s) made subsequent to Councildetermination
that the Final Socio-Economic Appendix is adequate shall be determined bythe facility's construction
cost, incorporating therequirements imposed on the facility's design by the negotiated siting agreement.
In determining the fee(s), the Council
16.03: continued
shall also take into account the cost imposed by the draft facility permit issued by the Department of
Environmental Quality Engineering, pursuant to M.G.L. c. 21C, if such a draft permit has been issued.