105 CMR 500.064
Review of Plans for Construction or Remodeling of a Pasteurization Plant, or Change in, or
Expansion of, Operations at a Pasteurization Plant
(A) When a pasteurization plant is to be constructed or extensively remodeled, or an existing
structure is to be converted for use as a pasteurization plant, or an operation is to be changed or
added, properly prepared plans and specifications for such construction, remodeling, or
alteration, showing layout, arrangement, and construction materials of work areas, and the
location, size, and type of fixed equipment and facilities, shall be submitted to the Department
for approval before such work is begun. No work shall be started until approval is granted.
(B) After the work has been completed, the Department shall inspect the pasteurization plant
prior to the start of operations to ascertain compliance with the approved plans and specifications
and with the requirements of 105 CMR 500.000.