225 CMR 20.05
Tariff Based Incentive Program for Solar Photovoltaic Generation Units
(1) Size of Program. The SMART Program shall support 1,600 MW and an additional capacity
of 1,600 MW post Publication Date, for a total of 3,200 MW of new solar generating capacity.
(2) SMART Program Effective Date(s). Solar Tariff Generation Units that receive a Statement
of Qualification under the SMART Program will be eligible to begin receiving incentive
payments upon the effective date of the SMART Tariffs, as approved by the DPU. Revisions
to the SMART Program pursuant to 225 CMR 20.07(5) that require amendments to the SMART
Tariffs shall take effect upon review and approval of revised SMART Tariffs by the DPU.
(3) Block Allocation. The amount of capacity available in each Distribution Company's service
territory will be proportional to the total electric load served to Massachusetts End-use
Customers by the Distribution Company in calendar year 2016. The Department may update the
amount of capacity available in proportion to total electric load served to End-use Customers by
each Distribution Company based on updated electric load served data, as available. Each
Distribution Company shall divide the capacity available in its service territory into 16 equally
sized Capacity Blocks, provided, however, that if a Distribution Company served less than 5%
of the total electric load collectively served to all Massachusetts End-use Customers by the
Distribution Companies in calendar year 2016, it may elect to have less than 16 equally sized
Capacity Blocks.
(a) Set-aside for Solar Tariff Generation Units Less than or Equal to 25 kW. Each Capacity
Block shall have a minimum of 20% and maximum of 35% of its total available capacity
reserved for Solar Tariff Generation Units with nameplate capacities less than or equal to
25 kW.
(b) Special Provisions for Block 1. Other than Solar Tariff Generation Units selected under
the one-time competitive procurement described in 225 CMR 20.07(3), no Solar Tariff
Generation Unit shall be eligible to qualify in a Distribution Company's first Capacity Block
unless it has a capacity equal to or less than 1,000 kW or is eligible to receive a
Compensation Rate Adder.
(c) Set-aside for Solar Tariff Generation Units Greater than 25 kW and Less than or Equal
to 500 kW. Each Capacity Block, starting with the first full capacity block after the
Publication Date, shall have a minimum of 20% of its total available capacity reserved for
Solar Tariff Generation Units with nameplate capacities greater than 25 kW and less than or
equal to 500 kW.
(d) Set-aside for Low Income Community Shared and Low Income Property Solar Tariff
Generation Units. Each Capacity Block, starting with the first full capacity block after the
Publication Date, shall have a minimum of 5% of its total available capacity reserved for
Low Income Community Shared and Low Income Property Solar Tariff Generation Units.
(e) Special Provision for Eversource Energy Capacity Blocks. Beginning with the ninth
CapacityBlock, the service territories formerlydesignated as NSTAR Electric Companyand
Western Massachusetts Electric Company, shall be combined into a single service territory
with a total available capacity equal to that amount previously available for the two separate
Distribution Companies. The total combinedcapacityavailable in this single service territory
shall be divided into eight equally sized Capacity Blocks. The Base Compensation Rates
established for the service territories formerly designated as NSTAR Electric Company and
Western Massachusetts Electric Company shall remain separate and will continue to apply.
(4) Transition between CapacityBlocks. If there is not enough capacityremainingin a Capacity
Block for a Solar Tariff Generation Unit to fit entirely within the Capacity Block, that Solar
Tariff Generation Unit shall receive a blended total compensation rate, which shall be prorated
according to the amount of the Solar Tariff Generation Unit's capacity that is assigned to each
Capacity Block.
(5) General Eligibility Criteria for Solar Tariff Generation Units.
(a) General Eligibility Requirements. The Solar Tariff Generation Unit must use solar
photovoltaic technology and be interconnected with the electric grid in the Commonwealth
ofMassachusetts. The aggregate maximum capacityof Solar Tariff Generation Unitslocated
on a single parcel of land shall be five MW and shall not be inclusive of any solar
photovoltaic generating capacity that is not qualified under 225 CMR 20.00. For any parcel
of land for which a Solar Tariff Generation Unit has submitted a Statement of Qualification
Application, if its current boundaries are the result of a subdivision recorded after
January 1, 2010, the Owner shall demonstrate to the Department that the subdivision was not
for the purpose of obtaining eligibility as a Solar Tariff Generation Unit. If the Owner fails
to make such a showing to the Department, the five MW limit shall apply to the metes and
bounds of the parcel as recorded prior to the subdivision.
(b) Program Close Date. The Department shall stop accepting Statement of Qualification
Applications under 225 CMR 20.00 on December 31, 2026. Solar photovoltaic Generation
Units wishing to qualify after that date must apply to be qualified under 225 CMR
28.00: Solar Massachusetts Renewable Target (Smart) Program 3.0.
(c) Construction Date Requirement. To submit a Statement of Qualification Application
under 225 CMR 20.06, a solar photovoltaic Generation Unit must not have an active
Statement of Qualification as defined under 225 CMR 28.00: Solar Massachusetts
Renewable Target (Smart) Program 3.0 or 225 CMR 14.00: Renewable Energy Portfolio
Standard – Class I and must demonstrate to the Department's satisfaction that on-site
physical work of a significant nature has begun on the solar photovoltaic Generation Unit
prior to December 31, 2025. On-site physical work of a significant nature shall include, but
not be limited to, the continuous installation of racks or other structures to affix photovoltaic
panels, collectors, or solar cells to a site. Solar photovoltaic Generation Units where on-site
physical work of a significant nature occurred on or after December 31, 2025 must apply to
be qualified under 225 CMR 28.00.
Exception to Construction Date Requirement. A solar photovoltaic Generation Unit that
has not begun on-site physical work of a significant nature prior to December 31, 2025 may
submit a Statement of Qualification Application under 225 CMR 20.06 if it can demonstrate
to the Department's satisfaction that the Owner, Authorized Agent, or Primary Installer has
made significant investment in the development process prior to December 31, 2025 and the
solar photovoltaic Generation Unit would not meet the eligibility criteria of 225 CMR
28.00: Solar Massachusetts Renewable Target (Smart) Program 3.0. The Owner,
Authorized Agent, or Primary Installer may demonstrate significant investment through
documentation including, but not limited to, Interconnection Service Agreement payments,
interconnection study payments, or equipment procurement. The Department shall review
and approve documentation for satisfying 225 CMR 20.05(5)(c) on a case-by-case basis.
(d) Public Utility Regulatory Policies Act of 1978 Requirements. A Solar Tariff Generation
Unit with a maximum net power production capacity of greater than one MW shall obtain
federal qualifying facility status from the Federal Energy Regulatory Commission pursuant
to 18 CFR § 292.207(a) and (b). A Solar Tariff Generation Unit with a maximum net power
production capacity of less than or equal to one MW shall attest to its status as a federal
qualifying facility in the Statement of Qualification application.
(e) RPS Class I Eligibility. For each MWh of electricity generation produced by a Solar
Tariff Generation Unit, it will be eligible to generate GIS Certificates encoded as RPS Class I
Renewable Generation Attributes. These GIS Certificates and any other GIS Certificates
associated with Environmental Attributes other than RPS Class I Renewable Generation
Attributes, shall be transferred directly to an account owned by the Distribution Company
in whose service territory the Solar Tariff Generation Unit is located upon issuance by
NEPOOL GIS.
(f) Land Use and Siting Criteria. A Solar Tariff Generation Unit must meet the following
performance standards, and will be placed into one of three categories with respect to the
land or property on which it is sited. For the purposes of 225 CMR 20.05(5)(e), previously
developed shall mean having preexisting paving, construction, or altered landscapes, and
does not include altered landscapes resulting from current agricultural use, forestry, or use
as preserved natural area.
1. Applicability of Land Use and Siting Criteria. Date of application for participation
in the SMART Program and project status as of the Publication Date will determine
which Land Use and Siting Criteria apply to a Solar Tariff Generation Unit.
a. Solar Tariff Generation Units that have received a Statement of Qualification as
of the Publication Date shall be subject to the Land Use and Siting Criteria as
outlined in 225 CMR 20.05(5)(e)2. through 6.
b. Effective after Publication Date all other Solar Tariff Generation Units must meet
the Land Use and Siting Criteria established by 225 CMR 20.05(5)(e)7.
c. Exception to 225 CMR 20.05(5)(e)1.b. after the Publication Date, a Solar Tariff
Generation Unit may be subject to the Land Use and Siting Criteria as outlined in
225 CMR 20.05(5)(e)2. through 6., if it can demonstrate to the Department's
satisfaction that the Solar Tariff Generation Unit meets the requirements of 225 CMR
20.06(1)(c)2. as of the Publication Date, and either submits an executed
Interconnection Service Agreement as detailed in 225 CMR 20.06(1)(c)1. within six
months of the Publication Date, or provides documentation that a complete
Interconnection Service Agreement application was submitted not less than 135
Business Days prior to the Publication Date.
2. Category 1 Land Use. Solar Tariff Generation Units that meet one or more of the
following criteria will be designated as either Category 1 Agricultural or Category 1
Non-agricultural:
a.
Category 1 Agricultural. Solar Tariff Generation Units located on Land in
Agricultural Use or Important Agricultural Farmland that meet one or more of the
following criteria will be designated as Category 1:
i.
Agricultural Solar Tariff Generation Units;
ii. Building Mounted Solar Tariff Generation Units;
iii. Floating Solar Tariff Generation Units;
iv. Canopy Solar Tariff Generation Units; and
v. Solar Tariff Generation Units sized to meet no greater than 200% of annual
operation load of an agricultural facility.
b. Category 1 Non-agricultural. Solar Tariff Generation Units not located on Land
in Agricultural Use or Important Agricultural Farmland that meet one or more of the
following criteria will be designated as Category 1:
i. Ground-mounted Solar Tariff Generation Units with a capacity less than or
equal to 500 kW;
ii. Building Mounted Solar Tariff Generation Units;
iii. Solar Tariff Generation Units sited on Brownfields;
iv. Solar Tariff Generation Units sited on Eligible Landfills;
iv. Solar Tariff Generation Units sited on Eligible Landfills;
v. Floating Solar Tariff Generation Units;
vi. Canopy Solar Tariff Generation Units;
vii.
Solar Tariff Generation Units that are ground-mounted with a capacity
greater than 500 kW and less than or equal to 5,000 kW that are on land that has
been previously developed; and
viii. Solar Tariff Generation Units that are ground-mounted with a capacity
greater than 500 kW and less than or equal to 5,000 kW that are sited within a
solar overlay district or that comply with established local zoning that explicitly
addresses solar or power generation.
3.
Category 2 Land Use. Solar Tariff Generation Units not otherwise designated
Category 1 that are ground-mounted with a capacity greater than 500 kW and less than
or equal to 5,000 kW and that are sited on land that:
a. has not been previously developed; and
b. is zoned for commercial or industrial use, shall be designated as Category 2 Land
Use.
4.
Category 3 Land Use. Solar Tariff Generation Units not otherwise designated
Category 1 or Category 2 that are ground-mounted shall be designated as Category 3
Land Use.
5. Ineligible Land Use. Solar photovoltaic Generation Units that meet one or more of
following criteria shall not be eligible to qualify as Solar Tariff Generation Units under
225 CMR 20.00:
a. Solar photovoltaic Generation Units on protected open space, as established under
Article XCVII of the Amendments to the Constitution, that do not meet the criteria
of Category 1 Land Use;
b. Solar photovoltaic Generation Units sited in a wetland Resource Area, as defined
in 310 CMR 10.04: Definitions, not including Buffer Zones, as defined in 310 CMR
10.04: Definitions, except as authorized by all necessary regulatory bodies; and
c. Solar photovoltaic Generation Units sited on properties included in the State
Register, as defined in 950 CMR 71.03: Definitions, except as authorized by
regulatory bodies.
6. Performance Standards. All ground-mounted Solar Tariff Generation Units with a
capacity greater than 500 kW must provide a certification from a professional engineer
that the construction of the Solar Tariff Generation Unit complied with the following
standards when installed on Land in Agricultural Use, Important Agricultural Farmland,
or other pervious open space:
a. no removal of all field soils;
b. existing leveled field areas left as is without disturbance;
c. where soils need to be leveled and smoothed, such as filling potholes or leveling,
this shall be done with minimal overall impact with all displaced soils returned to the
areas affected;
d. ballasts, screw-type, or post driven pilings and other acceptable minimal soil
impact methods that do not require footings or other permanent penetration of soils
for mounting are required, unless the need for such can be demonstrated;
e. any soil penetrations that may be required for providing system foundations
necessary for additional structural loading or for providing system trenching
necessaryfor electrical routing shall be done with minimal soils disturbance, with any
displaced soils to be temporary and recovered and returned after penetration and
trenching work is completed;
f. no concrete or asphalt in the mounting area other than ballasts or other code
required surfaces, such as transformer or electric gear pads;
g. address existing soil and water resource concerns that may be impacted to ensure
the installation does not disturb an existing soil and water conservation plan or to
avoid creating a negative impact to soil and water conservation best management
practices, such as stimulating erosion or water run-off conditions;
h. limited use of geotextile fabrics; and
i. maintain vegetative cover to prevent soil erosion.
7. Land Use and Siting Criteria Effective after the Publication Date. A Solar Tariff
Generation Unit must meet the performance standards and will be placed into one of
three categories with respect to the land or property on which it is sited as enumerated
in 225 CMR 20.05(5)(e)1. through 6., except as noted 225 CMR 20.05(5)(a)7.
a. Category 1 Non-Agricultural. Solar Tariff Generation Units not located on Land
in Agricultural Use or Important Agricultural Farmland that are a Public Entity Solar
Tariff Generation Unit will be designated as Category 1 Non-agricultural as in
20.05(5)(e)2b.
b. Category 2 Land Use. Solar Tariff Generation Units not otherwise designated
Category 1 that are ground-mounted with a capacity greater than 500 kW and less
than or equal to 5,000 kW that are sited within a solar overlay district or that comply
with established local zoning that explicitly addresses solar or power generation,
shall be designated as Category 2 Land Use as in 225 CMR 20.05(5)(e)3.
c. Ineligible Land Use. Solar photovoltaic Generation Units that meet one or more
of the following criteria shall not be eligible to qualify as Solar Tariff Generation
Units under 225 CMR 20.00:
i. One or more of the criteria established in 225 CMR 20.05(5)(e)5.;
ii.
Solar photovoltaic Generation Units sited on land designated as Priority
Habitat or Core Habitat, that do not meet the criteria of Category 1 Land Use; or
iii. Solar photovoltaic Generation Units sited on a parcel with 50% or more of
its area designated as Priority Habitat and/or Core Habitat, that do not meet the
criteria of Category 1 Land Use.
d. Ineligible Land Use for Additional Capacity. Solar photovoltaic Generation Units
seeking to obtain a Statement of Qualification for the 1,600 MW of additional
capacityavailable following the Publication Date pursuant to 225 CMR 20.05(1) and
that meet one or more of the following criteria shall not be eligible to qualify as Solar
Tariff Generation Units under 225 CMR 20.00:
i. One or more of the criteria established in 225 CMR 20.05(5)(e)7.c.;
ii. Solar photovoltaic Generation Units sited on land designated as Critical
Natural Landscape that do not meet the criteria of Category 1 Land Use; or
iii. Solar photovoltaic Generation Units sited on a parcel with 50% or more of
its area designated as Priority Habitat, Core Habitat, and/or Critical Natural
Landscape, that do not meet the criteria of Category 1 Land Use.
(g) Project Segmentation. No more than one Solar Tariff Generation Unit on a single
building, or one ground-mounted Solar Tariff Generation Unit on a single parcel or
contiguous parcels of land, shall be eligible to receive a Statement of Qualification as a Solar
Tariff Generation Unit. The Solar Program Administrator or the Department may require
Solar Tariff Generation Unit Owner or Authorized Agent to include a deed in the case of
recorded land, or a numbered certificate in the case of registered land, from the registry of
deeds with their Statement of Qualification Application in order to verifythat the Solar Tariff
Generation Unit meets this requirement.
(h)
Exceptions to Project Segmentation. Notwithstanding 225 CMR 20.05(5)(f), the
following types of Solar Tariff Generation Units may be eligible to receive a Statement of
Qualification, subject to demonstration to the Department's satisfaction that one of the
following exceptions should apply:
1. a Solar Tariff Generation Unit with an AC rated capacity of 25 kW or less that is
located on a parcel of land contiguous with another parcel or parcels of land containing
a Solar Tariff Generation Unit, provided the parcels of land were not the result of a
subdivision performed for the purpose of qualifying under 225 CMR 20.05(5)(g)1.;
2. a Solar Tariff Generation Unit with an AC rated capacity of 25 kW or less, a Canopy
Solar Tariff Generation Unit, or a Building Mounted Solar Tariff Generation Unit, which
is located on the same parcel of land as another Solar Tariff Generation Unit, provided
that the Solar Tariff Generation Unit is separately metered from the original Solar Tariff
Generation Unit and, in the case of a Solar Tariff Generation Unit with an AC rated
capacity of 25 kW or less or a Building Mounted Solar Tariff Generation Unit, is located
on a separate building from the original Solar Tariff Generation Unit;
3. a Solar Tariff Generation Unit with an AC rated capacity of 25 kW or less, or a
Building Mounted Solar Tariff Generation Unit, which is located on the same building
as another Solar Tariff Generation Unit, provided that the Solar Tariff Generation Unit
is separately metered from the original Solar Tariff Generation Unit and is connected to
a meter of a separate End-use Customer as the original Solar Tariff Generation Unit;
4. a Solar Tariff Generation Unit located on the same parcel or contiguous parcel of land
to another Solar Tariff Generation Unit that submits a Statement of Qualification
Application at least twelve months after the Commercial Operation Date of the original
Solar Tariff Generation Unit and is separately metered or that can demonstrate to the
Department’s satisfaction that the Owners of the Solar Tariff Generation Units are
unaffiliated parties;
5. a Solar Tariff Generation Unit that is physically located across multiple parcels of
land, provided that it is located behind a single interconnection point and single
production meter, and that its AC rated capacity is 5 MW or less;
6. a Solar Tariff Generation Unit that can demonstrate to the Department’s satisfaction
that documentation required to meet the criteria set forth in 225 CMR 20.06(1)(c) was
obtained prior to June 5, 2017;
7. a Solar Tariff Generation Unit that is physically located on a parcel or parcels of land
owned or controlled by the Massachusetts Department of Transportation as established
by M.G.L. c. 6C, and can demonstrate to the Department's satisfaction that it should be
granted an exception to the provisions of 225 CMR 20.05(5)(f); and
8. a Solar Tariff Generation Unit that can demonstrate to the Department's satisfaction
that it should be granted an exception to the provisions of 225 CMR 20.05(5)(f) for good
cause.
(i) Capacity Expansions. Both direct current (DC) and alternating current (AC) capacity
expansions to the capacity listed in a Solar Tariff Generation Unit’s Statement of
Qualification are not permitted except under the following circumstances:
1. a direct current capacity expansion to a Solar Tariff Generation Unit’s rated capacity
is permitted if the expansion occurs within a Solar Tariff Generation Unit’s Reservation
Period; and
2. direct current and alternating current capacity expansions following a Solar Tariff
Generation’s Commercial Operation Date may be allowed if the Solar Tariff Generation
Unit can demonstrate to the Department’s satisfaction that the expansion is de minimis
and is required for equipment replacement or reconfiguration necessary to ensure the
continued operation of the Solar Tariff Generation Unit.
(j) Special Provisions for Relocated and Replacement Generation Units. The Department
may provide a Statement of Qualification to a solar photovoltaic Generation Unit that meets
one of the following categories and criteria, as well as all other relevant provisions of
225 CMR 20.00:
1. Relocated Solar Tariff Generation Unit. A solar photovoltaic Generation Unit whose
equipment was used before January 1, 2018, to generate electrical energy outside of the
Commonwealth of Massachusetts, and that is interconnected with the electric grid in the
service territory of a Distribution Company on or after January 1, 2018, provided that no
components of the Power Conversion Technologywere used in a Generation Unit located
in the Commonwealth prior to January 1, 2018. No components from a Generation Unit
previously qualified as an RPS Class I Renewable Generation Unit, Solar Carve-out
Renewable Generation Unit, or Solar Carve-out II Renewable Generation Unit shall be
eligible to qualify as part of a Solar Tariff Generation Unit.
2. Replacement Solar Tariff Generation Unit. A solar photovoltaic Generation Unit that
replaces an inactive or decommissioned solar photovoltaic Generation Unit that had
operated on the same site before January 1, 2018, may submit a Statement of
Qualification Application for the portion of the total kW capacity that represents a net
increase over the total installed kW capacityof the previouslyinstalled solar photovoltaic
Generation Unit.
(k) Special Provisions for Distribution Company Owned Solar Photovoltaic Generation
Units. Any solar photovoltaic Generation Unit that is owned by a Distribution Company and
was approved to be constructed by the DPU, pursuant to M.G.L. c. 164, § 1A, shall not be
eligible to qualify as a Solar Tariff Generation Unit under 225 CMR 20.00.
(l)
Energy Storage Requirement. Solar Tariff Generation Units greater than 500 kW
applying for a Statement of Qualification for any available capacity in any capacity block
available after April 14, 2020 must be co-located with an Energy Storage System that meets
the eligibility requirements for an Energy Storage Adder pursuant to 225 CMR 20.06(1)(e).
Exceptions to Energy Storage Requirement. A Solar Tariff Generation Unit shall be exempt
from the requirement to be co-located with an Energy Storage System, as prescribed in
225 CMR 20.05(5)(k), if it can demonstrate to the Department's satisfaction that:
1. documentation required to meet the criteria set forth in 225 CMR 20.06(1)(c) was
obtained on or before the Publication Date; or
2. it should be granted an exception to the provisions of 225 CMR 20.05(5)(k) for good
cause.
(6) Reporting Requirements.
(a) Generator Account Registration. An asset must be established for individual Solar
Tariff Generation Units within a generator account at NEPOOL GIS. For Non-NEPOOL
Generators, as that term is defined under Rule 2.1(a)(vi) of the NEPOOL GIS Operating
Rules, multiple Solar Tariff Generation Units may be registered under a single asset.
(b) Settlement Market System Assets. The electrical energy output from a Solar Tariff
Generation Unit registered as a NEPOOL Generator, as that term is defined under Rule
2.1(a)(i) of the NEPOOL GIS Operating Rules, shall be verified by the ISO-NE.
(c)
Non-NEPOOL Market Assets. The electrical energy output from a Solar Tariff
Generation Unit registered as a Non-NEPOOL Generator, as that term is defined under Rule
2.1(a)(ii) of the NEPOOL GIS Operating Rules, shall be reported to the Independent Verifier,
as approved by the Department, for all such assets.
(d) Duration of Distribution Company Asset Ownership. A Distribution Company shall
retain the asset ownership and rights to all RPS Class I Renewable Generation Attributes
associated with a Solar Tariff Generation Unit registered in a Distribution Company's
NEPOOL GIS generator account for as long as the Solar Tariff Generation Unit is eligible
to receive payment for such RPS Class I Renewable Generation Attributes and any
Environmental Attributes as prescribed in 225 CMR 20.07(1). Following this period,
ownership rights to assets and the RPS Class I Renewable Generation Attributes, and any
other Environmental Attributes that a Solar Tariff Generation Unit generates, will be owned
by the Solar Tariff Generation Unit Owner.