225 CMR 29.12
Common Conditions and Requirements for Constructive Approval.
(1) Applicability. 225 CMR 29.12 applies to Consolidated Local Permit Applications which
result in Constructive Approval.
(2) In the case that a Consolidated Local Permit Application meets the criteria to receive
Constructive Approval, conditions and requirements as specified in the Department’s Guideline
on Common Conditions shall exclusively apply to the resulting Consolidated Local Permit.
Those conditions and requirements shall include but not be limited to: Administrative and legal
conditions and requirements addressing compliance, site inspections, changes in ownership,
timelines, and project alterations; Conditions and requirements for construction addressing visual
impact, vegetation, earthwork, working hours, chemicals and hazardous materials, and lighting
at the site; Conditions and requirements for operation and maintenance addressing facility access
stormwater control, emergency response, storage of hazardous materials, and general facility
operations;
Conditions and requirements for addressing decommissioning including
determination of inoperability, performance bonds, material disposal, recycling, insurance,
financial surety, and abandonment of Small Clean EnergyInfrastructure Facilities and anyrelated
equipment; and
The requirement that Small Clean Energy Infrastructure Facilities meet the Performance
Standards at 310 CMR 10.00: Wetlands Protection, including review under 310 CMR 10.00.