R 408.15753
R 408.15753 Gin poles and rope falls.
Cite as Mich. Admin. Code R 408.15753
Rule 5753. (1) A gin pole shall be properly attached to the wellhead or
Christmas tree with a chain and ratchet load binder in a manner that prevents
movement when the load is being handled. A chain and ratchet binder used to attach
the gin pole to the wellhead or Christmas tree shall be of a proper size and strength to
support the anticipated load to be handled.
(2) When the gin pole and rope falls are being used to lift the lubricator or
any other heavy object, the load shall be pulled from as near a vertical position as
practicable.
(3) A splice shall not be permitted in the entire length of rope of a rope fall,
except where the dead end is tied off.
(4) The rope shall be inspected at the beginning of each job to assure that it has
not been partially cut, frayed, or exposed to chemicals that may weaken it. A rope that
has been weakened by being cut or frayed or that has been in contact with damaging
chemicals shall be immediately replaced.
(5) The blocks of a rope fall shall be inspected at the beginning of each job for
shaft wear, the condition of bearings, or damaged or severely worn sheaves that may
cause rope damage. A block that shows excess wear or damage shall be immediately
replaced.
(6) A wire sling or equivalent that has been inspected for defects before
installation shall be used for the purpose of securing the lower wire line sheave. The
sheave shall be attached to a primary rig beam, blowout preventer, or permanent
stable fixture.
(7) A pin used in the makeup of a sheave wheel shall be secured with a cotter pin
or safety-type pin.