R 408.15771
R 408.15771 Freezing operations.
Cite as Mich. Admin. Code R 408.15771
Rule 5771. (1) A frozen plug shall be allowed to set a minimum of 1 hour per
inch of pipe diameter being frozen.
(2) When possible, a frozen plug shall be pressure-tested from above for a
minimum of 5 minutes to a pressure which is more than the known wellhead pressure.
(3) Following the pressure test, all pressure shall be bled off the pipe above the
frozen plug and observed for a minimum of 15 minutes before breaking out the pipe
and installing a new valve.
(4) After installing the new valve, void space between the frozen plug and valve
shall be filled with fluid.
(5) A frozen plug shall be allowed to thaw at a normal rate. Steam or hot water
shall not be used to thaw a frozen plug.