R 408.16355
R 408.16355 Blowing a batch type digester.
Cite as Mich. Admin. Code R 408.16355
Rule 6355. (1) A signal device such as a bell, horn, siren, or light shall be
installed in a batch type digester or blow pit room and chip bin and used before and
during blowing of the digester.
(2) A signal shall be used to warn an employee in a chip bin before loading the
batch type digester.
(3) A blow-off valve shall be opened slowly, and the valve shall be left open until
the digester cook signals the blow is completed.
(4) A digester cover shall not be removed until the blow has been completed.
An employee removing a digester cover shall wear protective equipment to guard
against burns from hot stock and steam.