R 408.41474
R 408.41474 Blasting.
Cite as Mich. Admin. Code R 408.41474
Rule 1474. (1) All blasting and explosives handling shall be conducted as prescribed
in Construction Safety Standard Part 27 “Blasting and Use of Explosives,” as referenced
in R 408.41410.
(2) An employer shall not allow an employee to enter a shaft or a tunnel heading
after blasting until air quality meets minimum requirements.
(3) Blasting wire shall be kept clear of electrical lines, pipes, rails, and other
conductive material, excluding earth, to prevent explosives initiation or employee
exposure to electric current.
(4) After blasting operations in shafts, a competent person shall determine if the
walls, ladders, timbers, blocking, or wedges have loosened. If so, necessary repairs shall
be made before employees other than those assigned to make the repairs are allowed in or
below the affected areas.