R 408.42610
R 408.42610 Multiple lift rigging procedure.
Cite as Mich. Admin. Code R 408.42610
Rule 2610. (1) A multiple lift shall only be performed if all of the following criteria
are met:
(a) A multiple lift rigging assembly is used.
(b) A maximum of 5 members are hoisted per lift.
(c) Only beams and similar structural members are lifted.
(d) All employees engaged in the multiple lift have been trained in multiple lift
procedures in accordance with R 408.42655(1).
(e) A crane shall not be used for a multiple lift where such use is contrary to the
manufacturer's specifications and limitations.
(2) Components of the multiple lift rigging assembly shall be specifically designed
and assembled with a maximum capacity for total assembly and for each individual
attachment point. This capacity, certified by the manufacturer or a qualified rigger, shall
be based on the manufacturer's specifications with a 5 to 1 safety factor for all components.
(3) The total load shall not exceed either of the following:
(a) The rated capacity of the hoisting equipment specified in the hoisting equipment
load charts.
(b) The rigging capacity specified in the rigging rating chart.
(4) The multiple lift rigging assembly shall be rigged with members attached at their
center of gravity and maintained reasonably level, rigged from top down, and rigged not
less than 7 feet (2.1 m) apart.
(5) The members on the multiple lift rigging assembly shall be set from the bottom
up.
(6) Controlled load lowering shall be used whenever the load is over the connectors.