Rule 2934. (1) Before an employee may perform any job related to hoisting
employees aloft for work, the employee shall receive training on safe access pursuant to
these rules. The operator of the hoist shall have a thorough understanding and comply
with subrules (2) to (9) of this rule pertaining to hoisting employees on the hoist line.
(2) An anti-two block device shall be used on all hoists, except where an employer
can demonstrate that ambient radiation frequency (RF) precludes that use. In such case, a
site-specific rigging plan shall be established and maintained on-site to ensure that
two blocking cannot occur and that effective communication between the hoist
operator and personnel being hoisted is maintained. This plan may include a cable
marking system, an employee situated on the tower in a position to observe the top
block, or any other system that will adequately ensure communication. All of the
following shall apply:
(a) A qualified person shall make the following determinations:
(i) The rigging, hoist line, and slings shall have a factor of safety of 10:1 against
failure during personnel lifts.
(ii) The hoist line used to raise or lower employees must be wire rope and may be
equipped with a swivel to prevent any rotation of the employees.
(iii) If a swivel is not used, then an alternate means shall be used to keep the
employees under control at all times.
(iv) If spin resistant wire rope is used, additional and more frequent inspections
are required due to different wear trends.
(b) When hoisting personnel (versus material), the hoist capacity load rating shall
be de-rated by a factor of 2 (reduced by 1/2) and must maintain a 10:1 factor of safety
after the reduction is considered. All employees shall be provided with and required to
use the proper personal protective equipment (including fall protection equipment)
that shall be inspected before each day before use.
(c) Except where the employer can demonstrate that specific circumstances or
conditions preclude its use, a guide line (tag line) shall be used to prevent the
employees or the platform from contacting the tower during hoisting.
(d) The gin pole shall be thoroughly inspected before use by a competent person to
determine that it is free from defects, including but not limited to, damaged and/or
missing members, corrosive damage, missing fasteners and cracked or broken welds at
joints, and general deterioration.
(e) The gin pole shall be attached to the tower as designed by a registered
professional engineer. There shall be a minimum of 2 attachment locations at the
bottom of the gin pole and near the top of the tower or the highest position available on
the structure.
(f) The personnel load capacity and material capacity of the lifting system in use
shall be posted at the site near the location of the hoist operator. If the system is
changed (for example, if the gin pole angle is changed), the posted capacity shall be
changed accordingly.
(g) In situations where a gin pole is not being used on a communication tower and
similar structures, a crown block may be used on the structure instead of a gin pole for
access to the work location.
(3) A trial lift of the maximum intended personnel load shall be made from ground
level to the location to which personnel are to be hoisted.
(a) The trial lift shall be made immediately prior to placing personnel on the hoist
line.
(b) The hoist operator shall determine that all systems, controls, and safety
devices are activated and functioning properly.
(c) A single trial lift may be performed for all locations that are to be reached from
a single set-up position.
(d) The hoist operator shall determine that no interference exists and that all
configurations necessary to reach those work locations remain under the limit of the
hoist's rated capacity and additionally maintain a 10:1 factor of safety against failure.
(e) The trial lift shall be repeated prior to hoisting employees whenever the hoist is
moved and set up in a new location or returned to a previously used position.
(f) After the trial lift, employees shall not be lifted unless the following
conditions are met:
(i) Hoist wire ropes are determined to be free of damage in accordance with the
provisions of construction safety standard part 10. lifting and digging equipment, R
408.41001a to R 408.41099a.
(ii) Multiple part lines are not twisted around each other.
(iii) The proof testing requirements have been satisfied.
(g) If the hoist wire rope is slack, the hoisting system shall be inspected to
ensure that all wire ropes are properly seated on drums and in sheaves.
(h) A visual inspection of the hoist, rigging, base support, and foundation
shall be made by a competent person immediately after the trial lift to determine
whether testing has exposed any defect or adverse effect upon any component of the
structure.
(i) Any defects found during the inspection that may create a safety hazard shall
be corrected and another trial lift shall be performed before hoisting personnel.
(ii) Prior to hoisting employees and after any repair or modification, the system
shall be proof tested to its rated load, holding it in a suspended position for 5 minutes
with the test load evenly distributed (this may be done concurrently with the trial lift).
(iii) After proof testing, a competent person shall inspect the rigging. Any
deficiencies found shall be corrected and another proof test shall be conducted.
(4) A pre-lift meeting shall be held before the trial lift at each location and
each time a new employee is assigned to the operation. The pre-lift meeting shall
meet both of the following requirements:
(a) The hoist operator, each employee to be lifted, and the crew chief shall attend.
(b) The hoist operator shall review the procedures to be followed and all
appropriate requirements contained in this rule with the other individuals present.
(5) The employer shall ensure that all trial lifts, inspections, and proof tests shall be
performed and documented, and the documentation shall remain on site during the
entire length of the project. The employer shall ensure that the pre-lift meeting is
documented, and the documentation shall remain on site during the entire length of the
project.
(6) Employees shall be hoisted to their work stations by using a personnel platform
or by using a boatswain chair and/or boatswain seat-type full body type harness.
(a) When a boatswain chair or boatswain seat-type full body harness is used to
hoist employees, the following shall apply:
(i) Not more than 2 employees may be hoisted at a time.
(ii) When hoisting an employee in a boatswain type full body harness, the harness
shall be attached to the hoist wire rope line in such a manner as to utilize the boatswain
seat part of the harness, placing the employee into a sitting position and a fall arrest
lanyard must be attached from the back D ring of the full body harness to a separate
attachment point.
(iii) Only locking-type snap hooks shall be used.
(iv) The harness shall be equipped with 2 side rings and at least 1 front and 1 back
D ring.
(v) The hoist line hook shall be equipped with a safety latch that can be locked in a
closed position to prevent loss of contact.
(vi) Employees must maintain 100% tie-off while moving between the hoist line
and the tower.
(b) When a personnel platform is used, the following provisions must be
followed:
(i) The maximum rate of travel shall not exceed 200 feet per minute when a tag or
trolley line is used to control personnel hoists. When a tag or trolley line cannot be
used, the rate of travel of the employee being hoisted shall not exceed 100 feet per
minute.
(ii) In all personnel hoist situations, the maximum rate shall not exceed 50 feet per
minute when personnel being lifted approaches to within 50 feet of the top block.
(iii) The use of free-spooling (friction lowering) is prohibited. When the hoist
line is being used to raise or lower employees, there shall be no other load attached to
any hoist line and no other load shall be raised or lowered at the same time on the same
hoist.
(iv) As-built drawings approved by a registered professional engineer shall
provide the lifting capacity of the gin pole and shall be available at the job site.
(v) The gin pole raising line shall not be used to raise or lower employees
unless it is rated for lifting employees.
(vi) Employees must maintain 100% tie-off while moving between the
personnel platform and the tower.
(7) Employees being hoisted shall remain in continuous sight of and/or in direct
communication with the operator or signal person. The following shall apply:
(a) In those situations where direct visual contact with the operator is not possible
and the use of a signal person would create a greater hazard for the person being hoisted,
direct communication alone, such as by radio, shall be used.
(b) When radios are used, they shall be non-trunked closed 2-way selective
frequency radio systems. When hand signals are used, the employees must use industry
standardized hand signals.
(8) Employees shall not be hoisted during adverse weather conditions (high winds,
electrical storms, snow, ice, or sleet) or other impending danger, except in the case of
emergency employee rescue. The competent person shall make the determination.
(9) The hoist system (gin pole and its base hoists) used to raise and lower
employees on the hoist line, shall not be used unless the following clearance distances
are maintained at all times during the lift:
Power line voltage phase to phase (kV) Minimum safe clearance (feet)
50 or below
10
Above 50 to 200
15
Above 200 to 350
20
Above 350 to 500
25
Above 500 to 750
35
Above 750 to 1,000
45