R 425.10
R 425.10 Conducting reclamation activities concurrently with mining operations.
Cite as Mich. Admin. Code R 425.10
Rule 10. Reclamation activities, particularly those relating to control of erosion and air
and water pollution, to the extent feasible, shall be conducted by the operator concurrently
with the mining operation, and in any event shall be initiated at the earliest possible time
after abandonment of any portion of the mining area.