R 425.3

R 425.3 Exploration.

Last amended: 1979Year: 2026Length: 74 wordsOfficial source

Cite as Mich. Admin. Code R 425.3

Rule 3. Removal of overburden and extraction of limited amounts of materials is not open- pit mining when done only for the purpose of exploration and to the extent necessary to determine the location, quantity, or quality of a mineral deposit. If the disturbed land does not become a part of a mining operation within 2 years, the operator shall grade and revegetate within practical limitations and in a manner acceptable to the supervisor.
R 425.3: R 425.3 Exploration. | Justis AI