R 281.823
R 281.823 Bridge construction procedures.
Cite as Mich. Admin. Code R 281.823
Rule 13. (1) Each construction project shall be completed so as to prevent erosion and
subsequent damaging siltation of streams or lakes. The area of erodible land exposed to the
elements by the grading operations at any one time shall be controlled by the owner's
engineer and the duration of such exposure before final trimming, finishing, or
maintenance of the area shall be as short as practicable.
(2) Gravel or stone consisting of durable particles of rock and containing only negligible
quantities of fines shall be used for construction pads, haul roads, and temporary roads in
or across streams.
(3) When required by the department, a sedimentation basin shall be constructed
downstream from the work site to trap silt and sediment resulting from construction
operations. A detailed sketch of a sedimentation basin is available on request from the
department. The collected silt and sediment shall be removed as directed by the owner's
engineer and the sedimentation basin shall be removed on completion of the project if
directed by the department. If found necessary, the department may assist the owner in the
design of a sedimentation basin.
(4) The disturbance of lands and waters that are outside the limits of construction as staked
shall be avoided.
(5) The owner shall give written notice 5 days before the start of work.