R 281.838
R 281.838 Final clean-up.
Cite as Mich. Admin. Code R 281.838
Rule 28. Final clean-up shall consist of removing the temporary haul road
across the stream; reshaping the stream as nearly as possible to its original
configuration, width, depth and bottom material; protection of the stream banks as
specified in R 281.837; and removing all construction material and debris from the
crossing site, including any material and debris downstream from the site as a result
of the pipeline construction.