R 299.2362
R 299.2362 Cementing.
Cite as Mich. Admin. Code R 299.2362
Rule 2362. Well casing shall be cemented by the pump and plug method or by a method
approved by the supervisor of mineral wells and allowed to set undisturbed at static balance
with the casing in tension, with surface pressure released, and with no backflow until the
tail-in slurry reaches 500 psi compressive strength, but for not less than 12 hours; however,
if backflow occurs, then the surface pressure shall not be released. The cement mixture
shall be of a composition and volume approved by the supervisor of mineral wells or
authorized representative of the supervisor of mineral wells. The casing shall be pressure-
tested before the cement plugs are drilled or the casing perforated. The pressure at the top
of the cement shall be equal to the expected operating pressure of the well; however, the
test pressure shall not exceed the API specification for hydrostatic test pressure for new
casing, API specification 5CT, specification for casing and tubing, April 1995, Fifth
Edition, which is adopted by reference in these rules. Copies are available for inspection at
the Lansing Office of the Geological and Land Management Division of the Department
of Environmental Quality. Copies may be obtained from the Michigan Department of
Environmental Quality, Geological and Land Management Division, P.O. Box 30256,
Lansing, Michigan 48909, at a cost as of the time of adoption of these rules of $42.00 each,
and from the American Petroleum Institute, 1220 L Street NW, Washington, DC 20050, at
a cost as of the time of adoption of these rules of $42.00 each.