R 299.2371
R 299.2371 Survey of directionally drilled well.
Cite as Mich. Admin. Code R 299.2371
Rule 2371. (1) A permittee of a well shall conduct a directional well survey on each
directionally drilled well, with actual survey points taken at suitable intervals from the
point of deviation to total depth to enable the course and the end point of the borehole to
be determined, or at intervals as approved by the supervisor of mineral wells or authorized
representative of the supervisor of mineral wells. All information obtained during and after
the survey shall be available to the supervisor of mineral wells or authorized representative
of the supervisor of mineral wells. A permittee shall file a certified copy of the survey with
the supervisor of mineral wells within 30 days after drilling completion, except as provided
in subrule (2) of this rule. A well shall not be utilized for the purpose for which it was
permitted until the survey has been filed with the supervisor of mineral wells.
(2) If a test well is drilled in an area of the state where rocks of precambrian age directly
underlie unconsolidated surface deposits or in those areas that have been designated by the
provisions of section 62508(c) of the act, an owner shall file the information required in
subrule (1) of this rule within 2 years after drilling completion.