R 299.2391
R 299.2391 Testing before operation of wells.
Cite as Mich. Admin. Code R 299.2391
Rule 2391. (1) Before injecting fluid into a well newly drilled for disposal, storage, natural
or artificial brine production, or into a previously existing well newly converted for storage,
disposal, or artificial brine production, a permittee shall provide for a demonstration of
internal mechanical integrity of the wellhead, casing, tubing, and annular seal assembly if
present, utilizing either a pressure test at a surface pressure of not less than 100 psig above
the maximum expected operating surface pressure of the well or an equivalent test
approved by the supervisor of mineral wells. The test shall be conducted by a qualified
person. A satisfactory pressure test shall meet the following requirements:
(a) For a storage or disposal well, the test shall show a change of pressure of not more
than 3% over a period of 60 minutes.
(b) For an artificial or natural brine production well, the test shall show a loss of pressure
of not more than 5% over a period of 30 minutes.
(2) Before injecting fluid into a well newly drilled for disposal, storage, or artificial brine
production or a previously existing well newly converted for storage, disposal, or artificial
brine production, a permittee of a well shall provide for a test of the external mechanical
integrity of the innermost casing string and the cement sheath and its external seal by a
method approved by the supervisor of mineral wells. The test shall be conducted by a
qualified person. If a pressure test is used to demonstrate mechanical integrity, the test shall
show a change of pressure of not more than 5% over a period of 30 minutes.