R 299.2405

R 299.2405 Rock profile determination.

Last amended: 2004Year: 2026Length: 50 wordsOfficial source

Cite as Mich. Admin. Code R 299.2405

Rule 2405. A permittee shall determine the cavity roof position not less than biennially. Generally accepted wireline logging methods shall be utilized. The results of the determination shall be filed with the supervisor of mineral wells not more than 60 days after completion and shall include all wireline logs run.
R 299.2405: R 299.2405 Rock profile determination. | Justis AI