R 299.2435
R 299.2435 Methods and materials.
Cite as Mich. Admin. Code R 299.2435
Rule 2435. (1) A permittee of a well shall ensure that a well is plugged from bottom to
top by a material approved by the supervisor of mineral wells.
(2) A permittee of a well shall ensure that the plugging procedures and materials do not
cause formation fracturing.
(3) A permittee of a well shall ensure that all casings abandoned with the hole are cut off
at a point not less than 4 feet below grade, a 1/2-inch steel welded plate or another type of
seal approved by the supervisor of mineral wells or authorized representative of the
supervisor of mineral wells is placed across the top of the pipe or pipes, and the permit
number of the well is permanently affixed to the plate or approved seal at the top of the
well. The permittee may install a permanent above-ground marker, showing the permit
number, above the well.