R 299.4304
R 299.4304 Type III landfill final cover design.
Cite as Mich. Admin. Code R 299.4304
Rule 304. (1) The owner and operator of a type III landfill unit shall install a final cover
system which is designed to minimize erosion and infiltration to the extent necessary to
protect the public health and the environment.
(2) If methane or other decomposition gases will be generated within a type III landfill,
the owner and operator shall design and employ a means of ensuring that gases cannot
travel laterally from the site or accumulate in structures.
(3) The owner and operator of a type III landfill shall grade portions of the landfill that
have received final cover so as to prevent storm water runoff from entering the active
portion.
(4) The owner and operator of a type III landfill shall design and operate the landfill so as
to bring the active portion up to final grade as soon as possible.
(5) To prevent the ponding of water on completed fill surfaces, the grading contours shall
tend to forestall development of local depressions due to post-construction settlement.
Slopes of the final cover shall not exceed 1 vertical on 4 horizontal or as necessary to permit
the establishment of vegetative cover. The final slope for a type III landfill that is a new
disposal area shall not be less than 2%, unless the director approves a final cover that is not
designed to minimize infiltration, as provided in subrule (7) of this rule, or otherwise
approves a variance under R 299.4108.
(6) Except as provided in subrule (7) of this rule, final cover for type III landfills shall be
comprised of an erosion layer underlain by an infiltration layer, as follows:
(a) The infiltration layer shall be comprised of 1 of the following:
(i) A minimum of 2 feet of compacted soil that is in compliance with R 299.4913. For
new disposal areas, the compacted soil shall also be protected by at least 2 feet of additional
soil.
(ii) A flexible membrane liner that is in compliance with R 299.4915.when properly
sloped and protected by at least 2 feet of soil.
(iii) An approved alternative material, when properly sloped and protected, if equivalent
protection is provided.
(b) The erosion layer shall consist of a minimum of 6 inches of earthen material that is
capable of supporting native plant growth.
(7) The owner and operator of a type III landfill may install a final cover that is not
designed to minimize infiltration if the landfill unit meets the design criteria of R
299.4307(3)(b) and the owner and operator demonstrate that infiltration through the final
cover will not violate the performance standards of R 299.4306 throughout the postclosure
period.