R 299.4313

R 299.4313 Type III landfill licensing procedure; construction verification; field notes; application package; inspection by solid waste control agency.

Last amended: 1993Year: 2026Length: 133 wordsOfficial source

Cite as Mich. Admin. Code R 299.4313

Rule 313. (1) A verification by a registered professional engineer that the construction of a type III landfill unit was in accordance with the approved engineering plans shall accompany all license applications for newly constructed units. Construction records that are specified in R 299.4921 shall accompany the verification. (2) An operating license application for a new unit that is upgraded to meet the requirements of these rules shall include as-built plans of the unit that are in compliance with the provisions of R 299.4910. (3) The application package shall be submitted to the solid waste control agency. (4) The solid waste control agency shall make at least 1 inspection of the landfill after receiving a license application and shall, before license issuance, evaluate the status of compliance with the act and these rules.
R 299.4313: R 299.4313 Type III landfill licensing procedure; construction verification; field notes; application package; inspection by solid waste control agency. | Justis AI