R 299.4313
R 299.4313 Type III landfill licensing procedure; construction verification; field notes; application package; inspection by solid waste control agency.
Cite as Mich. Admin. Code R 299.4313
Rule 313. (1) A verification by a registered professional engineer that the construction of
a type III landfill unit was in accordance with the approved engineering plans shall
accompany all license applications for newly constructed units. Construction records that
are specified in R 299.4921 shall accompany the verification.
(2) An operating license application for a new unit that is upgraded to meet the
requirements of these rules shall include as-built plans of the unit that are in compliance
with the provisions of R 299.4910.
(3) The application package shall be submitted to the solid waste control agency.
(4) The solid waste control agency shall make at least 1 inspection of the landfill after
receiving a license application and shall, before license issuance, evaluate the status of
compliance with the act and these rules.