R 299.4910
R 299.4910 Landfill engineering plans; design plans and engineering reports.
Cite as Mich. Admin. Code R 299.4910
Rule 910. (1) Engineering plans for a landfill shall include detailed engineering plans of
the proposed design and an engineering report that details all of the following for each
disposal unit:
(a) Soils underlying each liner system, as specified in subrule (2) of this rule.
(b) Compacted soil liners or natural soil that is used in place of a compacted liner, as
specified in subrule (3) of this rule.
(c) Bentonite geocomposite or flexible membrane liners, as specified in subrule (4) of this
rule.
(d) Primary leachate collection and removal systems, as specified in subrule (5) of this
rule.
(e) Secondary leachate collection systems, as specified in subrule (6) of this rule.
(f) Dewatering systems, as specified in subrule (7) of this rule.
(g) Other control systems, as specified in subrule (8) of this rule.
(h) The final cover, as specified in a closure plan that is in compliance with R 299.4446.
(i) Postclosure maintenance and monitoring, as specified in a plan that is in compliance
with R 299.4447.
(2) An engineering report on the characteristics of soils underlying any liner shall include
all of the following information:
(a) A settlement analysis that estimates total and differential settlement, including
immediate settlement, primary consolidation, and secondary consolidation based on
maximum loading.
(b) A slope stability analysis.
(c) A performance analysis under varying groundwater conditions.
(d) Calculations that show the potential for bottom heave or blowout.
(3) An engineering report on the soils that are likely to be used for any compacted or
natural soil liner shall include all of the following information:
(a) The location and thickness of soils to be used for the compacted or natural soil liner.
(b) Copies of well or boring logs that document the soil deposit.
(c) Data documenting that the soil source is in compliance with the soil classifications
specified in R 299.4913.
(d) For compacted soil liners, calculations which show that the volume of the source is
sufficient for liner construction.
(4) An engineering report on any bentonite geocomposite or flexible membrane liner to
be used shall include all of the following information:
(a) The methods of storage, handling, and installation, including any written instructions
from the manufacturer, and procedures for complying with the quality control requirements
of R 299.4914 and R 299.4915.
(b) The physical specifications of the liner material.
(c) The ability of liner material and scrim material, where applicable, to maintain physical
properties under varying conditions of temperature, pH, ultraviolet radiation, biological
attack, and prolonged leachate contact throughout the operating and postclosure life of the
landfill.
(5) The engineering plans for a landfill shall contain an engineering report on the design
of the leachate collection and removal system. The report shall include all of the following
information:
(a) Specifications for the material to be used for the leachate collection system.
(b) The design of the collection pipe, including all of the following information:
(i) Diameter.
(ii) Perforations.
(iii) Slope.
(iv) Spacing.
(v) Leachate compatibility.
(vi) Structural integrity under static and dynamic loadings.
(c) Design features that allow cleaning of drainage pipes within the system.
(d) Procedures to prevent clogging during construction and operation.
(e) Calculations to show that the leachate head will be 1 foot or less above the liner at
any point in the system, except the sump.
(f) Provisions to remove obstructions from the system.
(g) Calculations to determine the anticipated volume of leachate to be generated.
(h) Information on the proposed method of disposal for the leachate collected.
(6) An engineering report on a secondary collection or leak detection system shall include
the information specified in both of the following provisions:
(a) The information required under subrule (5) of this rule.
(b) The method of detecting, removing, and analyzing any leaks that are detected in the
system.
(7) The engineering plans for a landfill shall contain an engineering report for any
dewatering systems to be used. The report shall include all of the following information:
(a) Design calculations for the drain pipe diameter, slope, and spacing.
(b) Design features that allow cleaning.
(c) Procedures to prevent clogging during construction and operation.
(d) An evaluation of the structural suitability of underdrain pipe under both static and
dynamic loadings.
(8) The engineering plans shall contain information on systems to control all of the
following:
(a) Run-on.
(b) Runoff.
(c) Wind dispersal of particulate matter, where applicable.
(d) Gas that is generated within the landfill.
(9) Engineering plans for a landfill shall be prepared and sealed by a professional engineer
registered in the State of Michigan.