R 299.4916
R 299.4916 Landfill construction; construction quality assurance program and construction certifications.
Cite as Mich. Admin. Code R 299.4916
Rule 916. (1) A construction quality assurance (CQA) program is required for all new
landfill units and lateral extensions of existing units and for the final cover of existing units.
The program shall verify that the constructed unit is in compliance with all design criteria
and specifications in the construction permit or approved plans. The program shall be
developed and implemented under the direction of a CQA officer who is a registered
professional engineer.
(2) The CQA program shall address all the following physical components, where
applicable:
(a) Foundations.
(b) Dikes.
(c) Low-permeability soil liners.
(d) Flexible membrane liners.
(e) Leachate collection and removal systems and secondary collection systems.
(f) Final cover systems.
(3) Before construction begins on a unit that is subject to the CQA program under subrule
(1) of this rule, the owner or operator shall develop a written CQA plan. The plan shall
identify steps that will be used to monitor and document the quality of materials and the
condition and manner of their installation. The CQA plan shall include all of the following:
(a) Identification of applicable units and a description of how they will be constructed.
(b) Identification of key personnel in the development and implementation of the CQA
plan and CQA officer qualifications.
(c) A description of inspection and sampling activities for all unit components that are
identified in subrule (2) of this rule, including the observations and tests that will be used
before, during, and after construction to ensure that the construction materials and the
installed unit components are in compliance with the design specifications. The description
shall cover all of the following:
(i) Sampling size and locations.
(ii) Frequency of testing data evaluation procedures.
(iii) Acceptance and rejection.
(iv) Criteria for construction materials.
(v) Plans for implementing corrective measures.
(4) The CQA program shall include observations, inspections, tests, and measurements
that are sufficient to ensure all of the following:
(a) The structural stability and integrity of all components of the unit that are identified in
subrule (2) of this rule.
(b) Proper construction of all components of the liners, leachate collection and removal
system, leak detection system, and final cover system according to permit specifications
and good engineering practices and proper installation of all components according to
design specifications.
(c) Conformity of all materials used with design and other material specifications under
this part.