R 299.9621
R 299.9621 Quality control for landfills, surface impoundments, and waste piles.
Cite as Mich. Admin. Code R 299.9621
Rule 621. (1) Owners or operators of landfills, surface impoundments, and waste piles
shall conduct a quality control program during construction that ensures all the following:
(a) That the natural clay base meets or exceeds the thickness and permeability
requirements of R 299.9603(5), by doing either of the following:
(i) Obtaining soil borings and determining the natural moisture content as determined by
ASTM standard D2216-10; grain size distribution, sieve and hydrometer, as determined by
ASTM standards D6913-04 and D7928-16; classification by the unified soil classification
system as determined by ASTM standard D2487-11; Atterburg limits of the soil as
determined by ASTM standard D4318-10 at varying depths every 100 feet; and the
permeability
of
an
undisturbed
sample
every
200 feet
as
determined
by
ASTM standard D5084-10.
(ii) Utilizing resistivity surveys to replace or supplement borings specified in
paragraph (i) of this subdivision. The resistivity surveys must employ an electrode spacing
to give an effective depth of penetration. A sufficient number of stations must be used to
ensure that complete coverage to the edge of the waste management area is provided and
correlation with borings or wells is obtained.
(b) That the natural clay base provides an adequate sub-base for overlying liners and
leachate collection and removal systems, by evaluating the subgrade conditions for stability
and correcting wet or unstable areas.
(c) That compacted clay liners meet or exceed the requirements of R 299.9620(2), by
doing all the following:
(i) Constructing the liner so that the bottom liner and the side wall liner, dike, will be
continuous and completely keyed together at all construction joints.
(ii) During winter construction, removing all ice and snow before placing the liner and
not using frozen soil in any part of liner.
(iii) Determining the field density-moisture of the liner material by utilizing the
provisions of ASTM standard D6938-15 for each 1,000 cubic yards placed, with a
minimum of 1 test per day of construction or layer of clay placed.
(iv) Determining the particle size distribution, sieve and hydrometer, according to
ASTM standards D6913-04
and
D7928-16,
Atterburg
limits
according
to
ASTM standard D4318-10,
and
natural
moisture
content
according
to
ASTM standard D2216-10 of random samples of liner material from each 5,000 cubic
yards of material placed.
(v) Redetermining the density of liner materials by the modified proctor test,
ASTM standard D1557-12, when the texture of the soil changes and every 5,000 cubic yards
placed.
(vi) Determining the permeability with water of a soil sample every 10,000 cubic yards
placed by using ASTM standard D5084-10, which is adopted by reference in R 299.11001,
or other method approved by the director on a sample that is not less than 2.8 inches in
diameter.
(vii) Verifying liner thickness and subgrade slope by a final elevation check to ensure
that all the following requirements are met:
(A) The final elevation must be within plus or minus 0.2 feet of the approved plans.
(B) The slope reduction of the subgrade must not be greater than 10% of the approved
slopes.
(C) The final clay liner thickness must not be less than the approved thickness at any
point.
(d) The synthetic liners are properly installed, by doing all the following:
(i) Properly preparing the foundation for the liner by doing all the following:
(A) Compacting to the requirements of R 299.9620.
(B) Grading the foundation to a smooth and true line.
(C) Grading consistent with approved plans.
(D) Grading the foundation to be free from stones or deleterious material.
(E) Removing any vegetation from the foundation before installation of the liner.
(ii) Ensuring that field seaming is done under the direction of a registered professional
engineer and when weather conditions are favorable for installation.
(iii) Ensuring that field seams, joints, and mechanical seals are properly made by wiping
contact surfaces clean of dirt, dust, moisture, or other foreign material, ensuring that
seaming is done in accordance with manufacturer specifications and testing all field seams
by nondestructive tests approved by the director.
(iv) Recording the ambient temperature and liner temperature hourly during liner
installation or field seaming.
(e) That leachate collection and leak detection, collection, and removal systems are
installed so that the requirements of this rule are met, by doing both of the following:
(i) Making elevation checks not less than every 200 feet to verify the appropriate
thickness of granular material.
(ii) Sampling randomly not less than every 5,000 cubic yards placed to verify the
required aggregate classification.
(2) The quality control program required by subrule (1) of this rule must be documented
by written daily records of all work and tests performed during construction. All daily
records must be maintained in the operating record for the facility and available for
inspection by the director or the director’s authorized representative.
(3) ASTM standards D2216-10, D2487-11, D1557-12, D2434-68, D4318-10, D5084-10,
D6913-04, and D7928-16 are adopted by reference in R 299.11001.