Rule 2190. (1) Unless the department has required an individual national permit pursuant
to the provisions of subrule (3) or (4) of this rule, a point source discharge of storm water
from a construction activity will be deemed to have a national permit authorizing the
discharge if the criteria of subdivisions (a) and (b) of this subrule are met. Exception: small
construction activities, meaning 1 to 5 acres of disturbed soil as defined in 40 C.F.R.
§122.26(b)(15), are automatically deemed to have a national permit authorizing discharge
of storm water in accordance with this rule and are not required to meet the filing
requirements of subdivision(a) or (b) of this subrule, subrule (2)(j) of this rule, and
subrule(5)(b) of this rule. The construction permittee shall do both of the following:
(a) File with the department, on a form approved by the department, notice of coverage
pursuant to the provisions of this rule before the initiation of construction activity. The
notice of coverage shall include all of the following:
(i) A copy of the individual soil erosion and sedimentation control permit for the site as
issued to the construction permittee; or if the construction activity is to be carried out by
an authorized public agency, certification by the authorized public agency that an approved
control plan exists; or, for part 615 or part 631 permits, a copy of the permit, along with
any forms or diagrams pertaining to soil erosion and sedimentation control that were part
of the permit application.
(ii) Acknowledgement by the construction permittee that any discharge that is made
pursuant to the provisions of this rule shall be in compliance with part 31 of the act and the
rules promulgated thereunder.
(iii) A location map and a description of the nature of the construction activity.
(iv) The location of the proposed discharge and identification of the receiving water.
(v) The total area of the site and the area of the site that is expected to undergo construction
activity during the life of the project.
(vi) Name and certification number of a certified storm water operator responsible for
inspection of the construction activity in accordance with subrule (2)(e) of this rule.
(b) Provide a valid signature of the construction permittee or authorized representative on
the notice of coverage. If the construction permittee is a partnership, association,
corporation, industry, municipality, state agency, or interstate body, the valid signatory for
the notice of coverage shall be determined in accordance with R 323.2114.
(2) A construction permittee that has authorization to discharge under a national permit
pursuant to subrule (1) of this rule shall comply with all of the following provisions:
(a) Not directly or indirectly discharge wastes such as discarded building materials,
concrete truck washout, chemicals, lubricants, fuels, litter, sanitary waste, or any other
substance at the construction site into the waters of the state in violation of part 31 of the
act or rules promulgated thereunder.
(b) Be in compliance with a soil erosion and sedimentation control permit for the site or,
if the construction activity is carried out by an authorized public agency, the approved
control plan, including the selected control measures that are applicable to the site.
(c) Properly maintain and operate the soil erosion control measures.
(d) Have the soil erosion control measures under the specific supervision and control of a
storm water operator who has been certified by the department as properly qualified to
operate the soil erosion control measures. The certification shall be done in accordance
with the requirements of R 323.1251 et seq.
(e) Cause the construction activity to be inspected by a certified storm water operator once
per week, and within 24 hours after every precipitation event that results in a discharge
from the site, and ensure that any needed corrective actions are carried out. A log of the
inspections and corrective actions shall be maintained on file by the construction permittee
for review and shall be retained by the construction permittee for a period of 3 years from
the date of the inspection or corrective action.
(f) In accordance with the requirements for on-land facilities as set forth in spillage of oil
and polluting materials, being part 5 of these rules, provide facilities and comply with
reporting procedures for containment of any accidental losses of oil or other polluting
materials.
(g) Dispose of solids, sediment, filter backwash, or other waste that is removed from or
results from the treatment or control of storm water in compliance with applicable state
laws and regulations and in a manner that prevents any waste from entering waters of the
state.
(h) Allow the department to enter upon the site at any reasonable time before the
expiration of the authorization to discharge as set forth in subrule (5) of this rule, upon
presentation of credentials and other documents as may be required by law, for the purpose
of inspecting conditions relating to the pollution of any waters or determining compliance
with the provisions of this rule.
(i) Upon request, make available for public inspection or provide to the department all
reports or logs prepared pursuant to the provisions of this rule.
(j) File a revised notice of coverage in compliance with the provisions of subrule (1) of
this rule before any expansion of the construction activity or change in the soil erosion
control measures that requires a change in the soil erosion and sedimentation control
permit.
(3) The department may require that discharges from a construction activity be authorized
by an individual national permit if it has been determined by the department that unlawful
pollution cannot be adequately guarded against, and there is or may be water quality
degradation that will violate the commission act unless requirements in addition to those
in the soil erosion and sedimentation control permit are imposed. A determination by the
department for an individual national permit or other additional control constitutes grounds
for revocation of the authorization to discharge pursuant to the provisions of this rule.
(4) The department may require that discharges from a construction activity be authorized
by an individual national permit if it has been determined by the department that the
responsible part 91 permitting entity or authorized public agency is not carrying out a
program that is adequate to ensure that the requirements of part 91 of the act are complied
with.
(5) The authorization to discharge pursuant to the provisions of this rule expires as
follows:
(a) When the soil erosion and sedimentation control permit expires, or is revoked or
terminated by the part 91 permitting entity in accordance with the provisions of part 91 of
the act and 1969 PA 306, MCL 24.201 et seq., or when the authorized public agency
determines that the project has been completed by the stabilization of earth change activity.
(b) Five years from the date of the notice that is filed pursuant to the provisions of subrule
(1)(a) of this rule, if the authorization to discharge has not previously expired pursuant to
subdivision (a) of this subrule. This authorization may be extended by filing a new notice
in compliance with the provisions of subrule (1)(a) of this rule. The construction permittee
shall file a notice of termination with the department, on a form approved by the
department, when authorization to discharge expires as set forth in accordance with
subdivision (a) of this subrule. The notice of termination shall include the name and address
of the construction permittee, the location of the construction site, and the mailing address,
if available, and certification that stabilization of earth change activity has been completed
or, if the certification cannot be made, the reason why the authorization to discharge has
expired.
(6) The department may revoke authorization to discharge pursuant to the provisions of
this rule if an individual national permit is required pursuant to the provisions of subrule
(3) of this rule or in compliance with R 323.2159.
(7) Nothing in this rule shall be construed to preclude the institution of any legal action
or relieve the construction permittee from any responsibilities, liabilities, or penalties to
which the construction permittee may be subject pursuant to part 31 of the act or rules
promulgated thereunder.
(8) The provisions of this rule are severable, and if any provision of this rule or the
application of any provisions of this rule to any circumstances is held invalid, the
application of the provisions of this rule to other circumstances and the remainder of this
rule shall not be affected by the invalidity.
(9) The construction permittee shall take all reasonable steps to minimize any adverse
impact to the surface or groundwaters of the state that result from noncompliance with any
of the conditions specified in this rule.
(10) If, for any reason, the construction permittee does not comply with, or will be unable
to comply with, any of the conditions that are specified in this rule, the construction
permittee shall provide the department with the following information, in writing, within
5 days of becoming aware of the noncompliance or inability to comply:
(a) A description of the noncompliance and its cause.
(b) The period of noncompliance, including exact dates and times, or, if the
noncompliance is not corrected, the anticipated time that the noncompliance is expected to
continue and the steps taken to reduce, eliminate, and prevent recurrence of the
noncompliance.
(11) The provisions of this rule do not convey any property rights in either real or personal
property, or any exclusive privileges, authorize any pollution, impairment, or destruction
of the natural resources of the state, or the violation of any federal, state, or local laws or
regulations, or obviate the necessity of obtaining permits or approvals from other units of
government as may be required by law.
(12) The provisions of this rule do not exempt the construction permittee from giving
notice to public utilities and complying with each of the requirements of 1974 PA 53, MCL
460.701 et seq.
(13) This rule shall not provide authorization to discharge storm water from construction
activity which is mixed with non-storm water, or which is subject to an existing national
permit or general permit.