R 324.1003
R 324.1003 Restoration of well site; filling and leveling of cellars, pits, and excavations; removal of debris.
Cite as Mich. Admin. Code R 324.1003
Rule 1003. A permittee of a well shall fill and level the cellar and all pits and excavations,
remove or eliminate debris, minimize erosion, and restore the well site as nearly as
practicable to the original land contour or to a condition approved by the supervisor or
authorized representative of the supervisor as soon as practical after the completion of
plugging to the surface, but not more than 6 months after the completion of plugging to the
surface.